Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • West Virginia guideWest Virginia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›West Virginia
  4. ›Construction
  5. ›Greenmont Pedestrian Bridge Project

City of Morgantown·West Virginia

Greenmont Pedestrian Bridge Project

Closes 4/16/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Morgantown is seeking bids for the construction of a new pedestrian and bicyclist bridge over Deckers Creek. The project includes the construction of precast concrete abutments, installation of a prefabricated bridge, and trail and sidewalk asphalt tie-ins. Two additive alternates are included for realignment of the Deckers Creek Rail Trail and construction of ADA-compliant sidewalks and pavement restoration. The project requires a mandatory pre-bid conference and has specific requirements for bid submittal, qualifications, and contract award. Key aspects of the project include: • Construction of a prefabricated, single-span weathering steel truss bridge approximately 78 feet long • Installation of the bridge and construction of trail and sidewalk asphalt tie-ins • Two additive alternates for additional work • Mandatory pre-bid conference on April 8, 2026 • Bid opening on April 16, 2026 • Project duration of approximately 60 days for substantial completion and final acceptance

Attached files

Contact

(304) 284-9222

Key dates

Opened
3/25/2026
Questions due
4/9/2026
Pre-bid meeting
4/8/2026Mandatory
Closes
4/16/2026
Duration
45 calendar days for Substantial Completion and 15 calendar days for final acceptance, which translates to approximately 60 days or 2 months. However, to fit the requested format: 60 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
2026-12

Budget estimate

$500,000 – $2,000,000

The estimated cost of the project is not explicitly stated, but given the scope of work, which includes the construction of a prefabricated bridge, precast concrete abutments, and trail and sidewalk asphalt tie-ins, the cost could range widely. For similar construction projects, costs can vary significantly based on materials, labor, and location. However, considering the project's specifics, such as the bridge's size (approximately 78 feet long) and the inclusion of additive alternates, a rough estimate might place the project's value in the range of $500,000 to $2,000,000. This estimation is based on general construction costs and the complexity of the project. Factors influencing the cost include the prefabricated nature of the bridge, the need for precast concrete abutments, and the potential for additional work under the additive alternates.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Richmond·California

Top match · 72%

Richmond Greenway Bridge Project – Implementation Plan

Closes 11/19/2026Opened 10/19/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

70% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

BREC·Louisiana

69% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Cobb County, GA·Georgia

69% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of Harrisonburg·Virginia

68% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

Georgia Cobb County Department of Transportation·Georgia

68% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

68% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

U.S. Department Of Transportation·Wyoming

68% match

WY NP YELL 15(2), Madison River Bridge

Closes 7/1/2028Opened 7/28/2026

Connecticut Town of Cheshire·Connecticut

68% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

U.S. Department Of Transportation·Washington

68% match

WY NP YELL 15(2), Madison River Bridge

Closes 7/1/2028Opened 7/2/2026

Delaware Valley Regional Planning Commission·Pennsylvania

67% match

Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 12/4/2026Opened 10/30/2026

Division of Highways·North Carolina

67% match

U.S. Highway 17 Pedestrian Crossing

Closes 11/19/2026Opened 10/27/2026

Minnesota Department of Administration·Minnesota

67% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

City of Columbia·Missouri

67% match

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026Opened 9/29/2026

Connecticut Town of Cheshire·Connecticut

67% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

City of Palm Springs·California

66% match

East Palm Canyon Bridge Project

Closes 11/20/2026Opened 10/20/2026

City of Seattle·Washington

66% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

Delaware River Joint Toll Bridge Commission·New Jersey

66% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

Maryland State Highway Administration·Maryland

66% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

City of Alexandria·Louisiana

66% match

Masonic Drive Sidewalk - Hynson Bayou Pedestrian Bridge Replacement

Closes 12/1/2026Opened 10/23/2026

CPPJ Road, Bridge, & Utility·Louisiana

65% match

Garrie Cut‑Off Bridge Replacement Project – Calcasieu Parish Bridge Replacement

Closes 11/17/2026Opened 10/20/2026

Maryland Department Of General Services·Maryland

65% match

P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area

Closes 1/11/2027Opened 10/31/2026

Town of Camp Verde·Arizona

65% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

Maryland State Highway Administration·Maryland

65% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

City of Ontario·California

65% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026