The project involves the removal of approximately 4,900 square feet of non-friable floor tiles and mastic within the basement level of Building H at the Colorado State Mental Health Institute at Fort Logan. The work will be completed in two phases to allow access to the main basement mechanical room. The contractor will be required to provide a full containment work area, remove all non-metal baseboard and floor fillers, and ensure that the work area is properly wetted or misted during abatement activities.
Some key points to consider are:
• The contractor must verify the floor tile and mastic square footage to be removed and site conditions.
• The contractor must provide unit rates for the removal of one square foot of floor tile, one square foot of floor mastic, one square foot of floor filler, and one linear foot of baseboard.
• The contractor must ensure that all waste is properly containerized and disposed of at a landfill approved by the EPA to accept friable and non-friable asbestos waste.
• The contractor must provide proof of medical fitness to wear respiratory protection and current fit testing documentation for all employees.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.