Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›KB Dock Piers Ladder Replacement

U.S. Department Of Defense·Washington

KB Dock Piers Ladder Replacement

Closes 9/19/2026$100k – $250kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Naval Undersea Warfare Center (NUWC) Keyport is seeking a small‑business contractor to replace deteriorated pier ladders at its Keyport and Bangor facilities. The work consists of removing 13 existing 20‑ft ladder extensions, removing two upper ladder sections, and installing 12 new 20‑ft aluminum ladders fabricated from 6061 marine‑grade material. The contract is a firm‑fixed‑price, 100 % small‑business set‑aside with an estimated value between $100 k and $250 k. Offerors must be registered in SAM, possess a current Washington State business license, and provide required bonds, insurance, and safety certifications. Work must be completed within 120 calendar days of award, with delivery FOB destination to NUWC Keyport, WA. A pre‑bid site visit is scheduled for 03 Sep 2026 (optional but encouraged). • Remove 13 existing ladder extensions and 2 upper sections • Install 12 new 20‑ft marine‑grade aluminum ladders • Provide all required certifications, bonds, and insurance • Must be a Washington‑licensed small business • Firm‑fixed‑price, $100‑$250 k, 120‑day performance period • Pre‑bid site visit 03 Sep 2026 (optional)

Attached files

Contact

Dane Jacobson(Contract Specialist)

[email protected]

(360) 315-0382

Key dates

Opened
8/20/2026
Pre-bid meeting
9/3/2026
Site visit
9/3/2026
Closes
9/19/2026
Duration
120 days

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237990
Solicitation №
N0025326Q0009

Budget estimate

$100,000 – $250,000

The solicitation states a “Magnitude of the Requirement” between $100,000 and $250,000. Assuming a typical profit margin for small‑business construction contracts (≈10‑15 %) and accounting for required bonds, insurance, and labor, the net earnings for the contractor are likely to fall within that range. The low end reflects a minimal‑scope execution, while the high end assumes full scope with no change orders.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Key West·Florida

Top match · 68%

A-Dock Replacement and D-Dock Decking Replacement Key West Bight Marina

Closes 11/23/2026Opened 10/15/2026

City of Long Beach·California

66% match

Jib Crane Replacement

Closes 11/19/2026Opened 9/23/2026

City of Melbourne·Florida

63% match

Front Street Boat Dock Repair and Replacement

Closes 11/17/2026Opened 10/9/2026

Jacksonville Port Authority·Florida

63% match

BIMT ZPMC Cranes #10776 & #10778 Elevator Rack Replacement

Rolling / TBD closeOpened 4/8/2026

City of Long Beach·California

62% match

R-7307 Alamitos Bay Berth 1 And 2 Dock Replacement

Closes 11/19/2026Opened 10/8/2026

U.S. Department Of Defense·Maryland

61% match

Building 143 Concrete Scale Pad Expansion and Dock Leveler Replacement

Closes 11/9/2026Opened 10/30/2026

U.S. Department Of The Interior·Minnesota

60% match

Y--MN FERGUS FALLS WMD HANDRAIL STAIRS

Closes 11/13/2026Opened 10/27/2026

City of Watsonville·California

60% match

Pinto Lake Dock Replacement Project

Closes 11/10/2026Opened 10/2/2026

Lake Superior State University·Michigan

60% match

Exterior Dock House with Hydraulic Dock Leveler

Closes 11/6/2026Opened 10/28/2026

Jacksonville Port Authority·Florida

60% match

BLOUNT ISLAND MARINE TERMINAL HANJUNG CRANE #8841 REFURBISHMENT

Closes 11/17/2026Opened 10/15/2026

City of Hermosa Beach·California

60% match

CIP 623 - Pier Structural Repairs Project

Closes 11/12/2026Opened 10/15/2026

Utility Board of the City of Key West·Florida

60% match

KEYS Bid 23-26 Specifications for Kennedy Drive Substation Bus Replacement

Closes 11/2/2026Opened 10/1/2026

Port of Long Beach·California

59% match

HD-S3215 Pier B On-Dock Rail Support Facility Rail Yard Access Improvements

Closes 12/15/2026Opened 10/29/2026

Port of Tacoma·Washington

59% match

Wooden Light Pole Replacement Program (2026)

Closes 11/12/2026Opened 10/2/2026

U.S. Department Of Defense·Missouri

59% match

LD24 Bulkhead Hoist/Service Crane Replacement

Closes 12/31/2026Opened 3/25/2026

City of St. Petersburg·Florida

59% match

St. Petersburg Pier Pile Repairs

Closes 11/5/2026Opened 10/27/2026

City of Newport News·Virginia

59% match

Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/9/2026Opened 10/8/2026

City of Newport News·Virginia

58% match

IFB# 27-2089-6256, Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/2/2026Opened 10/8/2026

U.S. Department Of Defense·Pennsylvania

58% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/1/2026

Jacksonville Port Authority·Florida

58% match

Repair and Replacement of Four (4) Canopies for Jacksonville Port Authority, Dames Point Cruise Terminal

Rolling / TBD closeOpened 10/6/2026

U.S. Department Of Homeland Security·Florida

58% match

DOCK-SIDE (DS): CGC RELIANCE DS FY27

Closes 11/6/2026Opened 10/22/2026

City of Orlando·Florida

58% match

Lift Station No. 85 Replacement

Closes 12/4/2026Opened 10/26/2026

Chesapeake Bay Bridge and Tunnel District·Virginia

58% match

IFB M-26-004 Replace Vent Building UPS

Closes 11/6/2026Opened 9/18/2026

U.S. Department Of Homeland Security·Florida

58% match

USCGC HAMMER (WLIC 75302) USCG 68A BARGE (68014) DRYDOCK REPAIRS FY2027

Closes 11/9/2026Opened 10/20/2026

Jacksonville Port Authority·Florida

58% match

INTSALLATION OF NEW CRANE STOW PIN SOCKETS AT THE TALLEYRAND MARINE TERMINAL (TMT)

Closes 11/18/2026Opened 10/15/2026