Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alaska guideAlaska Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alaska
  4. ›Civil Engineering
  5. ›Palmer Hay Flats SGR Knik River Wayside Geotechnical…

Alaska Division of Parks and Outdoor Recreation, Design & Construction Section·Alaska

Palmer Hay Flats SGR Knik River Wayside Geotechnical Investigation

Closes 2/12/2026$50k – $100kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Alaska Division of Parks and Outdoor Recreation is seeking a contractor to provide geotechnical investigation and engineering services for the Palmer Hay Flats SGR Knik River Wayside Improvements project. The project includes developing a rudimentary boat launch parking area, constructing an elevated walkway/boardwalk, and constructing a Gold Star Family Memorial Monument. The contractor will be responsible for mobilization and demobilization, onsite subsurface investigation, soil sampling and testing, analysis, reporting, and geotechnical engineering recommendations. The project is expected to start in March 2026 and be completed by June 30, 2026. • The contractor will be required to provide a draft report and a final report. • The contractor will be responsible for securing all necessary permits and approvals. • The contractor will be required to minimize disturbance to the existing natural vegetation. • The contractor will be responsible for installing a slotted PVC pipe for future groundwater measurements and a solid PVC pipe for ground temperature monitoring. • The contractor will be required to backfill each borehole with drill cuttings and compact as practical as possible.

Attached files

Contact

Rangell Soriano(Engineer)

[email protected]

(907) 269-8937

Key dates

Opened
1/15/2026
Closes
2/12/2026
Duration
4 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
91007-3

Budget estimate

$50,000 – $100,000

The estimated cost of the project is between $50,000 and $100,000. This estimate is based on the project description and the scope of work. The actual cost may vary depending on the complexity of the project and the contractor's expertise.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

Top match · 68%

DOT&PF Notice of Geotechnical Investigation: Ketchikan Tongass Avenue & Water Street Viaducts

Rolling / TBD closeOpened 8/17/2026

City of Hutchinson·Minnesota

67% match

Hutchinson, City of South Fork Crow River Sediment Forebay BMI No. 0W1.123849

Closes 12/1/2026Opened 10/29/2026

City of Seattle·Washington

64% match

East Marginal Way S Preservation (FHWA)

Closes 11/18/2026Opened 10/14/2026

Township of North Brunswick·New Jersey

63% match

West Lawrence Pump Station Bank Stabilization Project

Closes 11/17/2026Opened 10/29/2026

Hamilton County, IN·Indiana

63% match

Public Safety Training Center Roadway and Levee

Closes 11/8/2026Opened 10/26/2026

U.S. Department Of The Interior·Colorado

63% match

Y--Pre-Proposal Site Visit

Closes 5/27/2027Opened 5/28/2026

U.S. Department Of The Interior·Colorado

63% match

Y--VICK 209252 Stabilize Mint Spring Bayou & VICK 310725/324137 Stabilize Terraces

Closes 3/13/2027Opened 3/13/2025

City of Bellevue·Washington

63% match

Bellevue Airfield Park Geotechnical Engineering Services

Closes 11/19/2026Opened 10/29/2026

U.S. Department Of Defense·Missouri

63% match

Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)

Closes 5/27/2027Opened 5/27/2026

Oregon Department of Transportation·Oregon

63% match

Geotechnical Drilling, Umpqua River Bridge

Closes 11/5/2026Opened 10/23/2026

City of Farmers Branch·Texas

63% match

Geotechnical and Materials Testing Services

Closes 11/3/2026Opened 10/9/2026

City of Green Cove Springs·Florida

63% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Defense·Missouri

63% match

Corning and Holt 10 Levee Repairs

Closes 7/21/2027Opened 7/21/2026

City of Austin·Texas

62% match

Gilleland Wastewater Interceptor

Rolling / TBD closeOpened 8/17/2026

City of Anderson·South Carolina

62% match

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

Washakie County Conservation District·Wyoming

62% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

Warren County·New Jersey

62% match

Surveying Services

Closes 11/13/2026Opened 10/15/2026

U.S. Department Of Defense·Louisiana

62% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

Northern Kentucky Water District·Kentucky

62% match

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026

Laramie Rivers Conservation District·Wyoming

62% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

U.S. Department Of Transportation·New Jersey

62% match

NJ-NY ERFO FW WARI 2019-1(1) - Wallkill River National Wildlife Refuge

Closes 12/15/2026Opened 10/28/2026

Shawnee County·Kansas

62% match

Construction of NW Maple Hill over Kansas River

Closes 12/2/2026Opened 10/26/2026

KC Board of Public Utilities·Kansas

62% match

Surveying and Services

Closes 11/4/2026Opened 9/25/2026

U.S. Department Of The Interior·Washington

62% match

C--GEOTECHNICAL ARCHITECTURE AND ENGINEER SERVICES IN

Closes 11/21/2026Opened 10/21/2026

City of Anderson·South Carolina

62% match

Generostee Creek WWTP & Rocky River WWTP Geomembrane Liner Replacement

Closes 11/4/2026Opened 10/6/2026