The Santa Nella County Water District Production Well No. 2 Project involves the construction of a new water production well in Volta, California. The well will be screened below the Corcoran Clay to meet the required production rate of 600 gallons per minute and to meet all water quality standards. The project is funded in part by the State Water Resources Control Board and is subject to prevailing wage and compliance with disadvantaged business enterprises rules. The contractor must possess a C-57 license to install and repair water wells and pumps.
• The project requires the construction of a 14-inch diameter, High Strength Low Alloy (HSLA) casing with HSLA steel wire wrapped well screen to a depth of approximately 600 feet.
• The well will be screened at approximately 460 to 500 feet below ground surface and 520 to 560 feet below ground surface.
• The project includes gravel feed and sounding tubes.
• The contractor must comply with prevailing wage and disadvantaged business enterprises rules.
• The project is funded in part by the State Water Resources Control Board.