The City of Keene is replacing eight existing flow control gates at the wastewater treatment facility. The new gates will be pre-purchased by the City in accordance with the contract documents. The City also wishes to have the existing chlorinated water spray foam piping in both Aeration Basins demolished. The contract was awarded to Waterline Industries Corporation, but was rejected due to lack of funding. The total cost of the project is $437,614.00.
• The project involves replacing eight existing flow control gates at the wastewater treatment facility.
• The new gates will be pre-purchased by the City in accordance with the contract documents.
• The City also wishes to have the existing chlorinated water spray foam piping in both Aeration Basins demolished.
• The contract was awarded to Waterline Industries Corporation, but was rejected due to lack of funding.
• The total cost of the project is $437,614.00.