This contract calls for the removal, disposal, and replacement of two existing airport security gates and their operators at Ellington Airport/Houston Spaceport. The work includes installing new gates equipped with cantilever wheels, updated controllers, and in‑ground loop detectors, as well as providing on‑site training for maintenance personnel. Electrical connections must be verified by airport electricians before energizing the new equipment, and old equipment must be placed in the customer’s dumpsters.
• Scope: Demolition, disposal, and installation of two security gates with full electrical integration.
• Requirements: New cantilever wheels, modern controllers, loop detectors, on‑site training, and compliance with airport electrical standards.
• Delivery: All work must be completed before the sealed‑bid opening on May 12 2026, with the agency retaining the right to verify installations.
Attached files
The award documents live at the source — open the contract source above to download them.