Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›2020 MAIN LINE EASEMENT REHABILITATION PROJECT

Awarded contract·Sacramento Area Sewer District·California

2020 MAIN LINE EASEMENT REHABILITATION PROJECT

Won by Express Sewer & Drain, Inc. +5 more$1.5MMultiple Award
Contract source

Awarded vendors

  • Express Sewer & Drain, Inc.
  • Southwest Pipeline & Trenchless Corp.
  • Insituform Technologies, LLC
  • SAK Construction, LLC
  • Nuline Technologies, LLC
  • Nor-Cal Pipeline Services

Description

The 2020 Main Line Easement Rehabilitation Project involves the furnishing of all labor, materials, tools, and equipment necessary for the project. The work includes pre-cleaning and television inspection of main lines, installation of cured-in-place pipe liners, reinstatement of lower lateral main line tap connections, replacement of lower laterals and main line taps, and removal and replacement of flusher branches. The estimated construction cost is $1,955,000. The contract was awarded to multiple vendors, with the apparent low bid from Express Sewer & Drain, Inc. at $1,468,242.00. Key points to consider: * The project requires a valid California Contractor's Class A - General Engineering License * The work involves various tasks such as pre-cleaning, installation of pipe liners, and reinstatement of tap connections * The estimated construction cost is $1,955,000 * The contract was awarded to multiple vendors with the apparent low bid from Express Sewer & Drain, Inc.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
6014

Contract value

$1,468,242

The estimated construction cost of the project is $1,955,000. However, the apparent low bid from Express Sewer & Drain, Inc. is $1,468,242.00, which is approximately 25% lower than the estimated cost. Based on this information, it can be estimated that the contract value is around $1,468,242.00. Factors that may influence the contract value include the complexity of the project, the number of vendors bidding, and the availability of materials and labor.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Georgia City of Elberton·Georgia

Top match · 69%

Electric Capital Improvement Project South Oliver Line Rehabilitation Project

Closes 12/2/2026Opened 10/23/2026

Illinois Tollway·Illinois

68% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Delaware River Joint Toll Bridge Commission·New Jersey

67% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

City of Lancaster·Texas

67% match

2026 Roadway Reconstruction Projects

Closes 12/16/2026Opened 10/7/2026

City of Minot·North Carolina

66% match

RFQ: CITY BRIDGE REHABILITATION PROJECT 5060

Closes 11/20/2026Opened 10/30/2026

City of Ormond Beach - Purchasing Office·Florida

66% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

City of Lake City and City of Bellechester·Minnesota

66% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

City of Fargo·North Dakota

66% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

Massachusetts Town of Westborough·Massachusetts

66% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Shawnee·Kansas

66% match

Resolution No. 2061

Closes 8/6/2030Opened 5/6/2025

Connecticut Dept. of Transportation·Connecticut

65% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

Municipality of Anchorage·Alaska

65% match

Old Seward Highway Surface Rehabilitation – International Airport Rd to Tudor Rd – Phase 2

Closes 11/5/2026Opened 10/7/2026

Port of Stockton·California

65% match

Pre-Construction Services Long Lead Double Track (LLDT) Rail

Closes 11/10/2026Opened 10/9/2026

Georgia City of College Park·Georgia

65% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

Georgia Liberty County Board of Commissioners·Georgia

65% match

MAIN TRAIL ROAD IMPROVEMENTS

Closes 11/17/2026Opened 10/14/2026

City of Broken Arrow·Oklahoma

65% match

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026

U.S. Department Of Defense·Missouri

65% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

Georgia Cobb County Department of Transportation·Georgia

65% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Virginia Department of Transportation·Virginia

65% match

B35_2027 BRIDGE REHABILITATION

Closes 11/18/2026Opened 10/13/2026

Washington DC Transportation (DDOT)·District of Columbia

65% match

Rehabilitation/Reconstruction of 27th Street Bridge over Broad Branch Stream

Closes 11/2/2026Opened 9/24/2026

City of Keene·New Hampshire

65% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Springfield·Illinois

64% match

Transmission Line Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

City of Keene·New Hampshire

64% match

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026Opened 10/21/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

64% match

Pell Bridge Rehabilitation

Closes 11/2/2026Opened 9/1/2026

Metropolitan Council·Minnesota

64% match

Notice of Intent to Solicit Blue Line Franklin Station Renovation

Closes 11/20/2026Opened 10/14/2026