The 2020 Main Line Easement Rehabilitation Project involves the furnishing of all labor, materials, tools, and equipment necessary for the project. The work includes pre-cleaning and television inspection of main lines, installation of cured-in-place pipe liners, reinstatement of lower lateral main line tap connections, replacement of lower laterals and main line taps, and removal and replacement of flusher branches. The estimated construction cost is $1,955,000. The contract was awarded to multiple vendors, with the apparent low bid from Express Sewer & Drain, Inc. at $1,468,242.00. Key points to consider:
* The project requires a valid California Contractor's Class A - General Engineering License
* The work involves various tasks such as pre-cleaning, installation of pipe liners, and reinstatement of tap connections
* The estimated construction cost is $1,955,000
* The contract was awarded to multiple vendors with the apparent low bid from Express Sewer & Drain, Inc.