Voith Hydro, Incorporated– proposing Oiles America
Shinn Mechanical, Incorporated
Description
The Jackson Hydroelectric Power Nozzle and Bushing Rebuild Project involves the rebuilding of 12 power nozzles originally provided by Fuji Electric in 1983-1984. The existing bushings are over 40 years old and reaching the end of their useful life. The project requires the replacement of these bushings with new ones. The key aspects of this contract include the technical requirements for the replacement parts, the bidding process, and the evaluation of bids. Some of the key points to consider are:
• The contract was awarded through an RFQ process, with a total of 4 bids received.
• The bids were evaluated based on their responsiveness to the technical requirements and their price.
• All bids were rejected due to various reasons such as not meeting technical requirements or exceeding the District's estimate.
• The District's estimate for the project was $150,000.00.
• The project is expected to provide parts to rebuild the power nozzles, which will extend their useful life.