Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Montana
  4. ›Construction
  5. ›MetraPark 6th Ave LED Sign

Awarded contract·Yellowstone County·Montana

MetraPark 6th Ave LED Sign

Won by Billings Sign Service$200kSingle Award
Contract source

Awarded vendors

  • Billings Sign Service

Description

The Yellowstone County Finance Department solicited bids to replace an existing outdoor LED message sign at MetraPark in Billings, MT with three new full‑color LED signs (one main sign and two back‑lit cabinets). After a competitive bidding process, the County posted a Notice of Intent to Award on August 5 2025, indicating that Billings Sign Service was the apparent successful offeror. The scope encompasses design, permitting, removal of the old sign, structural repairs, installation of new LED modules, wiring, controller integration, testing, painting of the sign structure, and a brief on‑site training session for County staff. The contract requires a 10 % bid security, compliance with Montana prevailing‑wage rules, a minimum five‑year parts warranty, ten‑year spare‑parts availability, and substantial commercial general liability insurance.

Attached files

Key dates

Bids closed
7/28/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
238210

Contract value

$200,000

The documents do not disclose a contract dollar amount. Estimating based on typical market pricing for comparable LED signage projects of this scale (main sign 20 × 12 ft, two auxiliary cabinets, high‑brightness 5,000 nits modules, structural repairs, permitting, and a 5‑year warranty) suggests a unit cost of roughly $150 – 200 per square foot for the LED hardware plus installation. The main sign area is 240 sq ft; the two cabinets add roughly 150 sq ft total, for ~390 sq ft. At $180 / sq ft = $70,200 for hardware. Adding design, permitting, structural work, labor, warranty, and overhead typically adds 150‑200 % to hardware cost, bringing the total into the $180 k‑$220 k range. Therefore a reasonable ball‑park estimate for the contract value is about $200 000.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Georgia City of Augusta·Georgia

Top match · 65%

26-283

Closes 12/1/2026Opened 10/30/2026

Georgia City of Augusta·Georgia

65% match

26-284 Marquee Sign Replacement � Henry H. Brigham Community Center

Closes 12/1/2026Opened 10/30/2026

City of Plano·Texas

63% match

Lighted Street Intersection Signs Upgrade

Closes 11/11/2026Opened 10/21/2026

City of Plano·Texas

62% match

Lighted Street Intersection Signs Upgrade

Closes 11/11/2026Opened 10/21/2026

City of Long Beach·California

60% match

"No Parking" Signs

Closes 11/5/2026Opened 10/13/2026

City of Cleveland·Ohio

59% match

116-26 - LED Street Security Lighting Luminaires

Closes 11/12/2026Opened 10/21/2026

City of San Mateo·California

59% match

Martin Luther King Park Emergency Field Lighting

Closes 12/3/2026Opened 10/30/2026

City of Pasadena·California

59% match

Installation of Street Lighting on Raymond Avenue from Maple Street to North City Limits

Closes 11/17/2026Opened 10/27/2026

City of Long Beach·California

59% match

R-7259 Palo Verde Avenue Pedestrian Bridge Sign Project 3003210017

Closes 11/10/2026Opened 9/30/2026

Arizona State University·Arizona

59% match

Athletic Venue LED Display Solutions

Closes 11/3/2026Opened 10/6/2026

County of Collier, FL·Florida

59% match

County Signage

Closes 11/20/2026Opened 10/7/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

58% match

LAMP: F96 T8/T12 HO LED LINEARREPLACEMENT

Closes 12/31/2026Opened 4/6/2026

Goodwyn Mills Cawood·Alabama

58% match

Wayfinding Signage Downtown Montgomery PROJECT NO. SP-5-26

Closes 11/17/2026Opened 10/7/2026

LA Public Works Engineering Bureau·California

58% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

Southern California Regional Rail Authority·California

58% match

Systemwide Signage and Wayfinding Master Plan

Closes 12/2/2026Opened 10/29/2026

City of Shawnee·Kansas

58% match

Notice of Hearing - Shawnee Industrial Park - 18760 Johnson Drive

Closes 4/30/2032Opened 4/30/2024

Idaho Transportation Department·Idaho

58% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

City of Bakersfield·California

57% match

Traffic Signal and Lighting System at the Intersection of Calloway Drive and Etchart Road

Closes 11/19/2026Opened 10/29/2026

City of Mauldin·South Carolina

57% match

SUNSET PARK SPORTS FIELDS LIGHTING PHASE 1

Closes 11/2/2026Opened 9/29/2026

City of Avon Park·Florida

57% match

Donaldson Park Pickleball Court Lighting Installation

Closes 11/24/2026Opened 10/22/2026

City of Augusta, GA (Augusta Commission)·Georgia

57% match

Marquee Sign Replacement – McDuffie Woods Community Center

Closes 12/1/2026Opened 10/30/2026

California Department of Transportation·California

57% match

ADA curb ramps, high tension cable barrier, and LED lighting.

Closes 11/5/2026Opened 9/21/2026

City of Tampa·Florida

57% match

Traffic Signs (Bid-Discount)

Closes 11/9/2026Opened 10/6/2026

Missouri Department of Transportation·Missouri

57% match

NW District, City of Milan, Construction of a 6' wide ADA compliant sidewalk along Business Highway 5 with curb and gutter to accommodate pedestrian traffic from Richard's Supermarket to Casey's General Store.

Closes 11/13/2026Opened 10/20/2026

Iowa City·Iowa

57% match

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 11/17/2026Opened 10/21/2026