Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wyoming guideWyoming Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wyoming
  4. ›Construction
  5. ›South Fork Little Medicine Bow River Irrigation Dam…

Awarded contract·Laramie Rivers Conservation District·Wyoming

South Fork Little Medicine Bow River Irrigation Dam Diversion Restoration Project

Won by Olson Excavating, LLC +2 more$70kMultiple Award
Contract source

Awarded vendors

  • Olson Excavating, LLC
  • Earth Work Solutions
  • Left Hand Excavating, LLC

Description

The South Fork Little Medicine Bow River Irrigation Dam Diversion Restoration Project involves the reconstruction of two small in-stream irrigation diversions on the South Fork of the Little Medicine Bow River. The project includes the construction of cross vane structures, general site and ditch grading, and the furnishing of all labor and equipment. The contract was awarded to three vendors: Olson Excavating, LLC, Earth Work Solutions, and Left Hand Excavating, LLC. The bid tabulation tables provide the estimated quantities and unit prices for each item. • The project requires the reconstruction of two small in-stream irrigation diversions. • The contract includes the construction of cross vane structures and general site and ditch grading. • The vendors are responsible for furnishing all labor and equipment. • The bid tabulation tables provide the estimated quantities and unit prices for each item. • The contract award date is October 9, 2020.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
236220
Solicitation №
2020-2

Contract value

$69,563

The contract value can be estimated based on the bid totals provided in the bid tabulation tables. The total bid amount for Site 2 is $32,449.8, and for Site 3 is $37,113.6. The total contract value can be estimated as the sum of these two amounts, which is $69,563.4.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Defense·Louisiana

Top match · 70%

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana

Closes 2/6/2027Opened 11/5/2024

East Bay Municipal Utility District·California

69% match

Mokelumne River Floodplain Habitat Restoration Project

Closes 11/6/2026Opened 9/21/2026

Laramie Rivers Conservation District·Wyoming

68% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Gwinnett County Government·Georgia

68% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

County of Ontario·New York

68% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

Washakie County Conservation District·Wyoming

68% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

U.S. Department Of Defense·Missouri

68% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

California Grants·California

68% match

Lower American River Conservancy Program

Rolling / TBD closeOpened 6/6/2025

Environmental Conservation, NYS Department of·New York

67% match

Hudson River Estuary Round 50 Tributary Restoration and Resiliency

Closes 12/17/2026Opened 9/25/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Michigan

67% match

Sebewaing River South Levee Repairs

Closes 1/23/2027Opened 11/17/2025

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of The Interior·Colorado

67% match

B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202

Closes 11/2/2026Opened 10/20/2026

U.S. Department Of Defense·Kentucky

67% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

NYS Cambria, Town of·New York

67% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

City of Hampton·Virginia

67% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

Inland Empire Utilities Agency·California

67% match

Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, Project No. RW15003.03

Closes 11/5/2026Opened 9/17/2026

Navajo Nation·Arizona

66% match

Proposal for the Tohatchi Diversion Project

Closes 11/20/2026Opened 9/16/2026

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

Citrus County - Board of County Commissioners·Florida

66% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

St. Louis County, MN - Purchasing Division·Minnesota

66% match

Stream Mitigation Bank Development

Closes 11/9/2026Opened 10/19/2026

Clean River Partners·Minnesota

66% match

Clean River Partners Cannon River Fish Passage Improvements Project No. 24X.135410

Closes 11/20/2026Opened 10/29/2026