The contract is for the refractory rebuild of Boiler #1 located at the FSU Central Utilities Plant (CUP). The objective is to enable FSU to enter a purchase order with a respondent to provide the necessary labor, equipment, and materials for the rebuild. The contract was awarded to McCain Engineering Co., Inc. with a base bid of $114,367.00. Key aspects of the contract include the scope of work, which involves the rebuild of the boiler, and the timeline, which includes the bid posting and submission dates. The contract also includes information on the commodity codes and descriptions, which are related to boiler installation, maintenance, and repair.
• The contract is for a refractory rebuild of a boiler
• The boiler is located at the FSU Central Utilities Plant (CUP)
• The contract was awarded to McCain Engineering Co., Inc.
• The base bid was $114,367.00
• The contract includes information on commodity codes and descriptions