Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Environmental Services
  5. ›Replacement of Centrifugal Blower at the Waste Water…

Awarded contract·City of La Porte·Texas

Replacement of Centrifugal Blower at the Waste Water Treatment Plant

Won by Global WET +1 more$143kMultiple Award
Contract source

Awarded vendors

  • Global WET
  • All Pump and Equipment

Description

The City of La Porte is seeking competitive bids for the replacement of a centrifugal blower at the Waste Water Treatment Plant. The replacement should be turnkey, including installation, electrical work, fittings, labor, miscellaneous parts, and start-up. The work should be performed by industry standards and follow all federal, state, and local regulatory codes. The bid tabulation lists two vendors, Global WET and All Pump and Equipment, with corresponding lump sum prices of $141,000.00 and $145,000.00, respectively. Key aspects of the contract include: • Replacement of a centrifugal blower at the Waste Water Treatment Plant • Turnkey installation, including electrical work, fittings, labor, and start-up • Compliance with industry standards and federal, state, and local regulatory codes • Bid tabulation lists two vendors with corresponding lump sum prices

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Environmental Services
NAICS
562910
Solicitation №
23024

Contract value

$143,000

Based on the bid tabulation, the contract value is estimated to be around $141,000.00 to $145,000.00, as these are the lump sum prices listed for the two vendors. The actual contract value may vary depending on the final award decision. Factors that may influence the contract value include the complexity of the replacement work, the cost of materials and labor, and the level of competition among bidders.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Springfield, MO - Division of Purchases·Missouri

Top match · 72%

IFB 011-2027 Southwest Treatment Plant Centrifuge Replacement Public Works Number (2025PW0060)

Closes 12/3/2026Opened 10/8/2026

Massachusetts City of Haverhill·Massachusetts

72% match

Centrifuge Conveyor Replacement at the Haverhill Wastewater Division Process Building

Closes 11/6/2026Opened 10/21/2026

Town of Narragansett·Rhode Island

70% match

Stand-by Generator Replacement - WWTP

Closes 11/6/2026Opened 11/6/2026

City of Burlington·Vermont

69% match

Proposals for the replacement of aeration blower for the City's North Wastewater Facility

Closes 11/6/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

69% match

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

Town of Narragansett·Rhode Island

68% match

Stand-by Generator Replacement - Wastewater Treatment Plant

Closes 11/6/2026Opened 10/9/2026

University of South Carolina·South Carolina

67% match

Chiller and Infrastructure Replacement-North Energy Plant Chiller#2

Closes 11/4/2026Opened 10/5/2026

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

Town of Tyrone·Georgia

67% match

2026 Generator Replacement Sewer Pump Station #3

Closes 11/4/2026Opened 10/5/2026

Coastal Carolina University·South Carolina

67% match

Singleton Energy Plant Boiler Replacement

Closes 11/5/2026Opened 10/13/2026

Jea·Florida

67% match

1412080446 (RFP) Brandy Branch Generating Station B52-B53 SCR Catalyst Replacement

Closes 12/16/2026Opened 11/22/2025

City of Charlotte·North Carolina

67% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

U.S. Department Of Defense·United States of America

66% match

PUMP UNIT,CENTRIFUG

Closes 11/12/2026Opened 10/28/2026

Upper Occoquan Service Authority·Virginia

66% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of Long Prairie·Minnesota

66% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026

City of Richland·Washington

66% match

Water Treatment Plant Filter Bay Valve Replacement

Closes 11/3/2026Opened 9/27/2026

U.S. Department Of Defense·Maryland

66% match

W912DR26X1B2N

Closes 1/8/2027Opened 1/8/2026

University of Massachusetts·Massachusetts

66% match

Efficiency Review of Chiller Plants Operation & Maintenance

Closes 11/13/2026Opened 10/16/2026

Virginia Community College System - System Office·Virginia

66% match

ATC Replace Chilled Water Central Plant at Tidewater Community College, Virginia Beach Campus, PC#260-B4260-112-c (M26TC127)

Closes 11/19/2026Opened 10/6/2026

UCLA Capital Programs·California

66% match

Cogeneration Plant New Electric Chiller (PREQUALIFICATION)

Closes 11/5/2026Opened 10/21/2026

City of Dayton, Ohio·Ohio

66% match

Miami Water Treatment Plant Boiler Replacement

Closes 11/5/2026Opened 10/15/2026

County of Sacramento·California

66% match

Chiller Overhaul Maintenance Services

Closes 11/4/2026Opened 10/19/2026

Town of Jupiter·Florida

66% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

City of Charlotte·North Carolina

65% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

U.S. Department Of Defense·United States of America

65% match

43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF

Closes 11/27/2026Opened 10/28/2026