This contract is for professional design services for the Old Lorain Connector Trail project at the Rocky River Reservation. The project aims to create a direct trail connection from the Kamm's Corners neighborhood to the Rocky River Reservation and Emerald Necklace trail system. The scope of work includes creating a comprehensive design that aligns with program goals, including drainage assessment, geotechnical investigations, environmental and permitting, cost estimating, and utility and city coordination. The contract was awarded to Michael Baker International, Inc. for a not-to-exceed amount of $329,900.
• The project includes multiple stages, including stage 1 and due diligence, stage 3 and final tracings, and if-authorized items such as sidewalk connection to Cleveland Clinic Fairview Hospital and trailhead improvements.
• The contract is for programming and due diligence, schematic design, design development, construction and permit documentation preparation, and construction administration.
• The project is part of Cleveland Metroparks' efforts to complete continuous riverfront access and public greenways on both sides of the Cuyahoga River with public facilities meeting ADA standards.