The 2017 Stormwater Improvements contract involves furnishing materials for and constructing stormwater improvements at the Kiefer Landfill. The project consists of replacing 164 feet of 36-inch diameter corrugated steel culverts with 36-inch diameter reinforced concrete pipe and installing approximately 9,682 square feet of grouted No. 2 rip rap. The contract was awarded to TNT Industrial Contractors, Inc. for a total bid amount of $129,001.16.
• The project includes replacement of corrugated steel culverts with reinforced concrete pipe
• The project includes installation of grouted No. 2 rip rap
• The contract was awarded to TNT Industrial Contractors, Inc.
• The total bid amount is $129,001.16
• The project is located at the Kiefer Landfill