Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Water and Wastewater
  5. ›ACCELERATED WATER MAIN REPLACEMENT PROGRAM 3 (5% SLBE)

Awarded contract·The Metropolitan District·Connecticut

ACCELERATED WATER MAIN REPLACEMENT PROGRAM 3 (5% SLBE)

$13MAwarded 5/6/2020Single Award
Contract source

Description

This contract calls for the accelerated replacement of roughly 16,000 linear feet of 8‑ to 12‑inch water main within the Metropolitan District’s service area in Connecticut. The work includes removal of existing pipe, installation of new ductile‑iron mains, service reconnections, renewals, and all associated appurtenances, with all labor, equipment, permits, and materials supplied by the awarded contractor. A mandatory pre‑bid conference was required, bidders had to submit a 10 % bid security, and must hold current DAS contractor pre‑qualification certificates for water and sewer lines. The project was funded by The Metropolitan District and officially awarded in May 2020. • Scope: Replace ~16,000 ft of 8‑12 in. water main, including services, renewals, and appurtenances. • Requirements: 10 % bid security, DAS contractor pre‑qualification, mandatory pre‑bid conference (Jan 23 2020). • Timeline: Bids due Feb 13 2020; award announced May 6 2020; execution schedule not specified.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
2/13/2020
Intent to award
5/6/2020
Awarded
5/6/2020
Starts
5/6/2020

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
2019B-28

Contract value

$13,000,000

The bid covers ~16,000 ft of water main. Industry estimates for ductile‑iron main replacement range from $600 to $800 per linear foot, plus additional costs for fittings, service connections, and mobilization. Using a midpoint of $700/ft yields $11.2 million. Adding 20 % for appurtenances and contingency brings the total to roughly $13–$15 million. Therefore a reasonable ball‑park value is about $13 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Bellevue·Washington

Top match · 70%

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Charlotte·North Carolina

69% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

City of Ontario·California

68% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Edgewater, FL·Florida

68% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

City of DeLand·Florida

68% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

New York City Department of Design and Construction·New York

67% match

EMERGENCY WATER MAINS

Rolling / TBD closeOpened 3/12/2021

Goodwyn Mills Cawood·Georgia

67% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Waukegan·Illinois

67% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

U.S. Department Of Agriculture·Utah

67% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

Gwinnett County Government·Georgia

67% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/22/2026

Oregon Tualatin Valley Water District·Oregon

67% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

New York City Department of Design and Construction·New York

67% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/27/2026

Western Virginia Water Authority·Virginia

67% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

67% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

New York City Department of Design and Construction·New York

66% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

City of Riverside·California

66% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

Village of Wilmette·Illinois

66% match

2027 Water Main Replacement Construction Engineering Services

Closes 11/4/2026Opened 10/15/2026

Gwinnett County Government·Georgia

66% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/21/2026

Hastings Utilities·Nebraska

66% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of Salina·Kansas

66% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

Grand River Dam Authority - GRDA·Oklahoma

66% match

Cooling Water System Performance Monitoring and Chemical Treatment Supply for GREC Units 2, 3 & 4

Closes 11/13/2026Opened 10/20/2026

Massachusetts Town of Westborough·Massachusetts

66% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Redlands·California

66% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Gwinnett County Government·Georgia

65% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/27/2026