The contract is for the Glade Manor BMP 20 Stormwater Pond Retrofit project. The work includes pond excavation and grading, installation of a channel diversion wall, extension of existing yard drains, installation of a submerged gravel wetland and underdrains, construction of a weir wall, and landscaping. The bid type is IFB, and the bid number is 21-289-CP. The bid was opened on June 10, 2021, and the preliminary bid tabulation lists several companies that submitted bids. The contract value is estimated to be around $800,000 to $1,000,000 based on the bid prices listed.
• The project requires the installation of a submerged gravel wetland and underdrains.
• The project includes the construction of a weir wall and the extension of existing yard drains.
• The project requires landscaping and the installation of a channel diversion wall.
• The bid was opened on June 10, 2021, and the preliminary bid tabulation is available.
• The contract value is estimated to be around $800,000 to $1,000,000.