The contract is for Sprayed Polyurethane Foam Roof Recoats and Repair. The work includes recoating and repairing roofs at various locations, including the Raper Armory, State Maintenance Facility, 115th Readiness Center, Civil Support Team, and Wheatland Armory. The contract was awarded to Wattle & Daub for a total bid of $389,300.00. The scope of work includes the application of sprayed polyurethane foam to the roofs, as well as any necessary repairs. The contract requires the contractor to provide all necessary materials, labor, and equipment to complete the work.
• The contract is for a specific period, but the exact duration is not specified.
• The contract requires the contractor to provide a bid bond and to sign an attendance sheet at the pre-bid meeting.
• The contract has two addenda, which are available for download on the Public Purchase website.
• The contract requires the contractor to upload their bid response documents to the Public Purchase website prior to the deadline.
• The contract has a mandatory pre-bid meeting, which was held on June 20, 2018.