The City of Palm Bay is requesting proposals for a pre-designed, engineered, and fabricated pedestrian bridge for the City's Cross City Trails Phase 1 Project. The bridge structure must meet the minimum specifications detailed in the request for proposals and attachments. The scope of work includes designing, providing design calculations, plans, fabricating, and delivering the bridge to the project construction site. The successful bridge supplier shall design, provide design calculations, plans, fabricate, and deliver the bridge to the project construction site located at 1992 Jupiter Blvd SW, in the Melbourne Tillman Canal 19 right of way, Palm Bay, Florida, 32908, and meet all requirements in the bridge specifications attachments. Key points to consider:
• The bridge must meet minimum specifications detailed in the request for proposals and attachments.
• The scope of work includes designing, providing design calculations, plans, fabricating, and delivering the bridge.
• The successful bridge supplier must meet all requirements in the bridge specifications attachments.
• A pre-proposal meeting was held on March 17, 2015, at 11:00 A.M. in the Public Works Engineering Conference Room.
• The Evaluation Selection Committee meeting was held on April 22, 2015, to discuss proposers for the project.