The City of Corpus Christi's Engineering department is seeking contractors for the Animal Control Remodel Improvements project. The project involves the remodel and addition of an existing Euthanasia Facility, including selective demolition, construction of a pre-engineered windstorm resistant certified steel shade structure, and installation of a gas-fired incinerator/crematorium. The engineer's estimate for the project is $772,250. The contract duration is 270 calendar days. Key aspects of the project include:
• Remodel and addition of the existing Euthanasia Facility
• Construction of a pre-engineered windstorm resistant certified steel shade structure
• Installation of a gas-fired incinerator/crematorium
• Selective demolition of interior and exterior masonry walls, overhead garage doors, and other existing structures
• Extension of existing underground site utilities to serve the incinerator/crematorium and emergency generator