The Rosemont Pump Station Replacement Project involves the demolition of the existing pump station and the construction of a new wet well with three submersible pumps, valve vault, manholes, piping, electrical equipment, and instrumentation control systems. The project also includes site improvements, incoming and outgoing sewer piping, and connections. The estimated construction cost is $2,160,000. The contract was awarded to Mountain Cascade, Inc. as the apparent low bidder with a bid price of $2,195,500.00. The project requires a Class A - General Engineering Contractor license.
• The project involves the replacement of the Rosemont Pump Station (SO32)
• The estimated construction cost is $2,160,000
• The contract was awarded to Mountain Cascade, Inc.
• The project requires a Class A - General Engineering Contractor license
• The project includes site improvements, incoming and outgoing sewer piping, and connections