Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Civil Engineering
  5. ›Design-Builder Qualifications - Valley Parkway Connector…

Awarded contract·Cleveland Metroparks·Ohio

Design-Builder Qualifications - Valley Parkway Connector Trail Phase II

Won by Engineered Tech Solution +8 more$4.5MMultiple Award
Contract source

Awarded vendors

  • Engineered Tech Solution
  • Environmental Design Grp.
  • RJ Platten
  • Larson Design Grp.
  • Nerone J Sons
  • F. Buddie
  • E.L. Robinson
  • Hull
  • Cavanaugh Building Cons

Description

The Cleveland Metroparks is seeking a design-builder to provide professional design and construction services for the Valley Parkway Connector Trail Phase II. The project involves constructing the second phase of the trail, which will link the all-purpose trail at Broadview Road and Valley Parkway in the Brecksville Reservation to the all-purpose trail just west of Ridge Road on Valley Parkway in the Mill Stream Run Reservation. The contract was awarded to multiple vendors, including Engineered Tech Solution, Environmental Design Grp., and others. The bid results show the estimated costs for each vendor, but the exact contract value is not stated. • The project involves design and construction services for the Valley Parkway Connector Trail Phase II. • The trail will link the all-purpose trail at Broadview Road and Valley Parkway in the Brecksville Reservation to the all-purpose trail just west of Ridge Road on Valley Parkway in the Mill Stream Run Reservation. • The contract was awarded to multiple vendors. • The bid results show the estimated costs for each vendor.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237990
Solicitation №
6165

Contract value

$4,500,000

The contract value is not explicitly stated, but based on the bid results, the estimated costs for each vendor range from $100,000 to over $1 million. Assuming an average cost of $500,000 per vendor, and with 9 vendors, the total contract value could be around $4.5 million. However, this is a rough estimate and the actual contract value may be higher or lower.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Georgia Cobb County Department of Transportation·Georgia

Top match · 79%

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Georgia Cobb County Department of Transportation·Georgia

78% match

Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project

Closes 1/15/2027Opened 9/10/2026

Cobb County·Georgia

75% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Keene·New Hampshire

75% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Keene·New Hampshire

75% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Cincinnati·Ohio

74% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

County of Chester·Pennsylvania

73% match

Struble Trail Extension to Marsh Creek State Park

Closes 11/4/2026Opened 9/25/2026

City of Green Cove Springs·Florida

73% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

Cobb County, GA·Georgia

73% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of Fresno·California

73% match

River West Fresno Eaton Trail Extension Phase 1

Closes 11/20/2026Opened 10/21/2026

City of Cleveland·Ohio

73% match

North Coast Connector

Closes 12/30/2026Opened 10/1/2026

Pierce County·Washington

73% match

Pipeline Trail Phase 3 - Architecture and Engineering Services

Closes 11/20/2026Opened 10/30/2026

City of Fort Myers·Florida

73% match

John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)

Closes 11/16/2026Opened 10/7/2026

Maryland Department of Natural Resources·Maryland

72% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

City of Lake Wales·Florida

72% match

RFP 27-02 GC Services for Kiwanis Park Loop Trail

Closes 11/4/2026Opened 9/30/2026

City of Gainesville - Procurement Division·Florida

72% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

City of Maryville·Missouri

72% match

South Main Trail Connection Project - Maryville, MO

Closes 11/10/2026Opened 10/8/2026

Virginia Department of Transportation·Virginia

72% match

A46_2027 SMART SCALE - SHARED USE PATH

Closes 11/18/2026Opened 10/14/2026

Harris County·Georgia

72% match

Man-O-War Trail, Phase VI

Closes 1/18/2027Opened 12/5/2022

Missouri Department of Transportation·Missouri

72% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

Minnesota Department of Administration·Minnesota

72% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Connecticut Department of Transportation·Connecticut

72% match

RFP - Technical Proposal - Quinebaug River Trail in the Town of Plainfield

Closes 11/13/2026Opened 9/9/2026

Georgia Cobb County Department of Transportation·Georgia

72% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of Plano·Texas

72% match

RFQ Lavon Farms Connector - K Avenue to Jupiter Road | Project No. ENG-S-00033

Closes 12/9/2026Opened 10/26/2026

Missouri Department of Transportation·Missouri

71% match

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026