Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Nacimiento Water Pipeline - North Salinas River Crossing…

Awarded contract·County of San Luis Obispo·California

Nacimiento Water Pipeline - North Salinas River Crossing Repair - Paso Robles, CA

Won by V. Lopez Jr & sons +5 more$1.4MMultiple Award
Contract source

Awarded vendors

  • V. Lopez Jr & sons
  • Unified Field Services
  • Whitaker Construction Group, Inc.
  • Spiess Construction Co., Inc.
  • Specialty Construction, Inc.
  • Raminha Construction, Inc.

Description

This contract involves the installation of HDPE carrier pipe inside of the existing steel pipe casing at the existing North Salinas River Crossing located in Paso Robles, California. The project includes furnishing and field-joining of high density polyethylene (HDPE) pressure pipe, installing the HDPE pipe inside of the existing steel casing using horizontal directional drilling (HDD) equipment and construction means and methods, removing, modifying and reinstalling existing steel pipe and steel pipe specials, field hydrostatic pressure testing of the HDPE carrier pipe, trench excavation, excavation support and trench protection, and placing and compacting pipe zone and trench zone backfill materials. The engineer's estimate for the project is $1,892,100. • The project involves the installation of HDPE carrier pipe inside of the existing steel pipe casing. • The project includes furnishing and field-joining of high density polyethylene (HDPE) pressure pipe. • The project requires the installation of the HDPE pipe inside of the existing steel casing using horizontal directional drilling (HDD) equipment and construction means and methods. • The project involves removing, modifying and reinstalling existing steel pipe and steel pipe specials. • The project requires field hydrostatic pressure testing of the HDPE carrier pipe. • The project includes trench excavation, excavation support and trench protection, and placing and compacting pipe zone and trench zone backfill materials.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
300641

Contract value

$1,400,000

Based on the bid totals provided, the estimated value of the contract is between $1,026,873 and $1,567,600. The engineer's estimate for the project is $1,892,100. Considering the bid totals and the engineer's estimate, a reasonable estimate for the contract value would be around $1,200,000 to $1,500,000.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

County of San Luis Obispo·California

Top match · 78%

Nacimiento Water Project Unit G Repair Construction Management

Closes 11/3/2026Opened 9/29/2026

City of El Paso De Robles·California

73% match

WATER 24in POTALBE MAIN CROSSING HIGHWAY CROSSING

Closes 11/18/2026Opened 10/29/2026

City of Redlands·California

71% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

West County Wastewater·California

70% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Rancho Palos Verdes·California

70% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

Santa Clara Valley Water District·California

69% match

COYOTE-ALAMITOS CANAL SHOTCRETE REPAIRS

Closes 11/10/2026Opened 10/13/2026

Santa Clara Valley Water District·California

69% match

Pacheco Pumping Plant Pump 12 Rebuild

Closes 12/8/2026Opened 10/20/2026

U.S. Department Of Defense·California

69% match

BRINE PIPELINE ACCESS IMPROVEMENTS

Closes 2/4/2027Opened 8/12/2026

City of Chula Vista·California

69% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

City of Riverside·California

69% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

California Department of Transportation·California

69% match

Colorado River bridge replacement.

Closes 12/17/2026Opened 10/26/2026

City of Cortez·Colorado

68% match

2027 Raw Waterline Inspection Project

Closes 12/15/2026Opened 10/28/2026

Texas City of San Antonio·Texas

68% match

Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 Bond

Closes 12/1/2026Opened 10/28/2026

City of San Antonio·Texas

68% match

23-03922 Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 Bond

Closes 12/1/2026Opened 10/28/2026

City of Sanibel·Florida

68% match

WASTEWATER COLLECTION SYSTEM REPAIRS - PHASE 1

Closes 11/12/2026Opened 10/13/2026

San Antonio Water System·Texas

68% match

1-Time Purchase of 54-inch Pipe Cleaning at Agua Vista WTP

Closes 11/5/2026Opened 10/15/2026

San Antonio Water System·Texas

68% match

1-Time Purchase of 54-inch Pipe Cleaning at Agua Vista WTP

Closes 11/5/2026Opened 10/15/2026

U.S. Department Of The Interior·California

68% match

CA-SAN LUIS NWR-FIRE SYSTEM REHAB

Closes 11/30/2026Opened 10/29/2026

City of Riverside·California

67% match

WATER WELL REHABILITATION PROGRAM FY2026/2027

Closes 11/20/2026Opened 10/23/2026

Santa Maria-Bonita School District·California

67% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

Eastern Municipal Water District·California

67% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

U.S. Department Of The Interior·Utah

67% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

Oak Manor Municipal Utility District·Texas

67% match

Waterline Rehabilitation along Oak Trail, Oak Manor Drive, & Shady Oak Court

Closes 11/5/2026Opened 10/23/2026

The Metropolitan Water District of Southern California·California

66% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026