Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Energy and Utilities
  5. ›PWC - Generation Hydroelectric Project Cathodic Protection…

Awarded contract·Snohomish County PUD·Washington

PWC - Generation Hydroelectric Project Cathodic Protection Improvements

Won by Mesa Products Inc.$168kSingle Award
Contract source

Awarded vendors

  • Mesa Products Inc.

Description

The contract is for the Generation Hydroelectric Project Cathodic Protection Improvements, which includes drilling a 375-foot deep well for installation of a vertical impressed current deep anode groundbed and installation of a District-supplied stand to house a new rectifier and related equipment. The project also involves commissioning and testing of installed cathodic protection equipment. The estimated cost of the project is $168,000.00, but the proposed bid amount exceeded the 15% threshold, leading to a recommendation to reject the bid. • The project includes drilling a 375-foot deep well for installation of a vertical impressed current deep anode groundbed. • The project involves installation of a District-supplied stand to house a new rectifier and related equipment. • The project includes commissioning and testing of installed cathodic protection equipment. • The estimated cost of the project is $168,000.00. • The proposed bid amount exceeded the 15% threshold, leading to a recommendation to reject the bid.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Industry
Energy and Utilities
NAICS
221118
Solicitation №
24-1500-SC

Contract value

$168,000

The contract’s estimated value can be estimated based on the proposed bid amount, which is $216,845.00. However, this amount exceeded the 15% threshold of the estimated cost of the project, leading to a recommendation to reject the bid. The estimated cost of the project is $168,000.00, which can be used as a basis for the estimation. Factors that may influence the likely contract value include the scope of work, materials, and labor required for the project. Considering these factors, the estimated value of the contract can be estimated to be around $168,000.00.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Power Authority of New York·New York

Top match · 73%

CATHODIC PROTECTION SERVICES

Closes 11/3/2026Opened 10/13/2026

Loudoun Water·Virginia

72% match

Cathodic Protection Testing Services

Closes 11/20/2026Opened 10/26/2026

U.S. Department Of Defense·Florida

70% match

CATHODIC PROTECTION SURVEY/INVENTORY/ASSESSMENT SERVICES

Closes 11/23/2026Opened 10/21/2026

Imperial Irrigation District·California

67% match

Construction Services for Protection Relays Replacement Programs

Closes 11/24/2026Opened 9/29/2026

Loudoun Water·Virginia

66% match

RFP 2026-071-1400002-Cathodic Protection Testing Services

Closes 11/20/2026Opened 10/26/2026

U.S. Department Of Defense·Oklahoma

66% match

Eufaula Powerhouse Hydroelectric Generator Rewind

Closes 11/13/2026Opened 10/27/2026

Connecticut Dept. of Correction·Connecticut

66% match

INSTALLATION OF IMPRESSED CURRENT CP SYSTEM

Closes 11/4/2026Opened 10/21/2026

Connecticut Dept. of Correction·Connecticut

66% match

INSTALLATION OF IMPRESSED CURRENT CP SYSTEM

Closes 11/4/2026Opened 10/21/2026

NYS Rochester-Genesee Reg. Transportation Authority·New York

66% match

Fueling Station Electrical Distribution Upgrades

Closes 11/20/2026Opened 10/26/2026

City of Charlotte·North Carolina

66% match

Irwin Creek WWTP Stormwater Improvements Project

Rolling / TBD closeOpened 5/1/2026

City of Gallup·New Mexico

65% match

Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Closes 11/6/2026Opened 7/24/2026

Alaska Department of Environmental Conservation – Village Safe Water Program·Alaska

65% match

Notice of Categorical Exclusion Determination - Marshall Phase 9 Water and Sewer Improvements

Rolling / TBD closeOpened 9/25/2026

NYS OGS Design & Construction - Construction Contractors·New York

65% match

Replace Electrical Panels – Electrical Panel Replacement and Generator Installation Project

Closes 11/18/2026Opened 10/13/2026

City of Pomona·California

65% match

RESERVOIR NO. 2C REPAIRS AND SAFETY IMPROVEMENTS FD528 – CC8125 – PROJECT WORKTAG 95082

Closes 11/18/2026Opened 10/8/2026

Alaska Department of Environmental Conservation·Alaska

65% match

University of Alaska Southeast Water Line Improvements Categorical Exclusion Determination

Rolling / TBD closeOpened 10/9/2026

New York State Energy Research and Development Authority·New York

65% match

Window Heat Pump Demonstration Program - Phase I

Closes 6/30/2027Opened 11/14/2025

City of Lake Charles·Louisiana

65% match

CITY OF LAKE CHARLES, LOUISIANA HAZARD MITIGATION GRANT PROGRAM (HMGP) LIFT STATION BACK‑UP POWER IMPROVEMENTS

Closes 11/17/2026Opened 10/22/2026

U.S. Department Of Defense·Oklahoma

64% match

Webbers Falls Excitation System Replacements

Closes 11/5/2026Opened 10/9/2026

Corrections and Community Supervision, NYS Dept. of·New York

64% match

ARC FLASH - Switchgear

Closes 11/19/2026Opened 10/28/2026

The Metropolitan Water District of Southern California·California

64% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026

U.S. Department Of Defense·Oklahoma

64% match

Generator, Direct Cu

Closes 10/14/2027Opened 10/14/2026

Snohomish County PUD·Washington

64% match

Carbon Free Resources (Renewable & Non-Emitting)

Closes 12/4/2026Opened 10/14/2026

Alaska Department of Environmental Conservation·Alaska

64% match

Aleutian Homes Phase VII Water and Sewer Determination of Categorical Exclusion

Rolling / TBD closeOpened 8/17/2026

U.S. National Energy Technology Laboratory·United States of America

64% match

Grid Supply Chain Alternatives to Lead Energy Dominance (SCALED)

Closes 2/8/2027Opened 10/30/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

64% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026