The contract is for the Generation Hydroelectric Project Cathodic Protection Improvements, which includes drilling a 375-foot deep well for installation of a vertical impressed current deep anode groundbed and installation of a District-supplied stand to house a new rectifier and related equipment. The project also involves commissioning and testing of installed cathodic protection equipment. The estimated cost of the project is $168,000.00, but the proposed bid amount exceeded the 15% threshold, leading to a recommendation to reject the bid.
• The project includes drilling a 375-foot deep well for installation of a vertical impressed current deep anode groundbed.
• The project involves installation of a District-supplied stand to house a new rectifier and related equipment.
• The project includes commissioning and testing of installed cathodic protection equipment.
• The estimated cost of the project is $168,000.00.
• The proposed bid amount exceeded the 15% threshold, leading to a recommendation to reject the bid.