The City Cemetery Roadway and Irrigation Improvements project involves furnishing and installing equipment, facilities, services, and appurtenances as indicated in the Contract Documents. The work includes roadway improvements, irrigation system improvements, and related work. The project is being managed by the Salt Lake City Engineer's Office, and the contract was awarded to MC Green. The project aims to improve the infrastructure of the City Cemetery, including the roadway and irrigation systems.
• Roadway improvements: removal of existing asphalt pavement, curbing, and features; installation of new pavement, curb, and gutter.
• Irrigation system improvements: replacement of existing irrigation system with new HDPE mains, electrical PVC pipe, and wiring.
• Related work: tree protection, excavation, and installation of street signs and decorative posts.