The contract is for the replacement of a 45-foot-long, 36-inch corrugated metal pipe (CMP) culvert with a 42-inch high-density polyethylene (HDPE) culvert on North Lincoln Street. The project involves the removal of the existing culvert, excavation, and installation of the new culvert. The contract was awarded to two vendors: C.D. Trucking, Inc. and F. Lucuis Construction. The bid tabulation document provides the unit bid prices and total bids for each vendor. The scope of work includes granite curb removal, unclassified excavation, common structure excavation, rock structure excavation, granular backfill, crushed gravel, and more.
• Replacement of the existing 36-inch CMP culvert with a 42-inch HDPE culvert
• Removal of the existing culvert and excavation for the new culvert
• Installation of the new culvert and backfilling with granular material
• Construction of slope paving with city-supplied granite slabs
• Implementation of erosion control measures, including temporary sedimentation basins and silt fences
• Maintenance of traffic during construction