Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Civil Engineering
  5. ›Design Services, Snohomish River Bridge #1 Scour Mitigation

Awarded contract·Snohomish County·Washington

Design Services, Snohomish River Bridge #1 Scour Mitigation

$350kAwarded 12/16/2022Single Award
Contract source

Description

This solicitation seeks professional design services to address scour mitigation for Bridge #1 on the Snohomish River. The work includes hydraulic analysis, structural design modifications, field inspections, and preparation of construction‑ready drawings to ensure the bridge’s long‑term stability against water‑induced erosion. The County will evaluate proposals through a standard RFQ process, with questions directed to the purchasing office and a technical assistance phone line available for vendors. • Scope: hydraulic and structural design, field surveys, and deliverable construction documents for scour mitigation. • Timeline: bid opening on March 30 2022, proposals due April 26 2022, award expected December 2022. • Point of Contact: [email protected]; phone (425) 388‑3344 for technical inquiries.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
4/26/2022
Intent to award
12/16/2022
Awarded
12/16/2022
Starts
3/30/2022

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
541330
Solicitation №
RFQ-22-005SB

Contract value

$350,000

No contract dollar amount is disclosed in the public record. Design services for a bridge scour mitigation project typically range from a few hundred thousand to well over a million dollars, depending on the complexity of hydraulic modeling, the extent of field work, and the detail of construction documents required. Considering the size of a county‑owned river bridge, the likely scope (analysis, design modifications, and full construction‑ready drawings) suggests a mid‑range estimate of roughly $350,000. This estimate assumes a firm‑fixed‑price contract for a single‑vendor design team with modest field‑inspection requirements.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Martin County Purchasing·Florida

Top match · 73%

CR-708 Bascule Bridge Scour Protection

Closes 11/18/2026Opened 10/9/2026

City of Cedar Rapids·Iowa

72% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

72% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

71% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Cobb County, GA·Georgia

71% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of Cedar Rapids·Iowa

71% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

70% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

70% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Nevada County·California

70% match

Rock Creek Road at Rock Creek Bridge – Engineering Design Services

Closes 11/30/2026Opened 10/15/2026

Georgia Cobb County Department of Transportation·Georgia

70% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of Cedar Rapids·Iowa

70% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Clark County·Nevada

70% match

Cottonwood Avenue Ponding Mitigation and Sim Street Improvement

Closes 11/3/2026Opened 10/13/2026

City of Newton·Kansas

70% match

Newton Plum Street Bridge Rehabilitation Design

Closes 11/3/2026Opened 10/14/2026

Cuyahoga County·Ohio

70% match

RQ16425: Highland Road Bridge Engineering Services

Closes 11/5/2026Opened 10/5/2026

Washington Transportation, Dept of·Washington

70% match

Bridge & Structures – Preservation Structural Scoping & Design Services

Closes 11/4/2026Opened 10/13/2026

The City of Columbus·Ohio

70% match

RFQ033860 - Olentangy River Rd/Snouffer Rd Home Sewage Treatment System

Closes 11/13/2026Opened 10/13/2026

Sterling Heights·Michigan

70% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

City of Mason·Ohio

69% match

Snider Road Widening Project - Phase 2

Closes 11/17/2026Opened 10/19/2026

Texas Department of Transportation·Texas

69% match

LOCAL LET MAINTENANCE CONTRACT, DENTON CO, BRIDGE SCOUR REPAIR

Closes 11/12/2026Opened 10/15/2026

Shawnee County·Kansas

69% match

Construction of NW Maple Hill over Kansas River

Closes 12/2/2026Opened 10/26/2026

Covington Municipality·Rhode Island

69% match

088-26-GREEN INFRASTUCTURE STORMWATER PROJECT DESIGN

Closes 11/2/2026Opened 11/2/2026

City of Cedar Rapids·Iowa

69% match

8th Ave Bridge Replacement & Floodwalls Construction Engineering & Inspection Services

Closes 11/10/2026Opened 10/20/2026

Oregon Department of Transportation·Oregon

69% match

Geotechnical Drilling, Umpqua River Bridge

Closes 11/5/2026Opened 10/23/2026

City of San Antonio·Texas

69% match

23-03935 George Road Low Water Crossing (Hunters Bow to NW Military Highway)

Closes 11/3/2026Opened 9/25/2026

City of Creve Coeur·Missouri

69% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026