Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kansas guideKansas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kansas
  4. ›Construction
  5. ›The Kansas Avenue Arterial Mill and Overlay, Kansas…

Awarded contract·City of Olathe·Kansas

The Kansas Avenue Arterial Mill and Overlay, Kansas Ave.(Dennis Ave. to Cedar St.) and Southgate St. (Kansas Ave. to Harrison St.)

Won by Freeman Concrete Construction, LLC +4 more$1.3MMultiple Award
Contract source

Awarded vendors

  • Freeman Concrete Construction, LLC
  • O'Donnell & Sons Construction Co., Inc.
  • McAnany Construction, Inc
  • Kansas Heavy Construction, LLC
  • Bettis Asphalt & Construction, Inc.

Description

The contract involves the Kansas Avenue Arterial Mill and Overlay project, which includes milling and asphalt resurfacing, subgrade repair, concrete curb and gutter replacement, sidewalk and ADA sidewalk ramp replacement, driveway replacement, storm sewer inlet and pipe improvements, pavement markings, and permanent signing. The project is located on Kansas Avenue and Southgate Street in Olathe, Kansas. The contract was awarded through a competitive bidding process, with five companies submitting bids. The contract value is estimated to be around $1.3 million. Key aspects of the project include: • Milling and asphalt resurfacing of approximately 23,848 square yards • Installation of 2" modified superpave asphaltic concrete surface • Replacement of concrete curb and gutter, sidewalks, and driveways • Installation of storm sewer inlets and pipes • Pavement markings and permanent signing The project requires the contractor to mobilize to the site, perform the necessary work, and demobilize upon completion. The contract also includes a contingency allowance for unexpected expenses.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
3-P-001-14

Contract value

$1,300,000

Based on the bid tabulation, the estimated contract value is around $1.3 million. This estimate is derived from the grand total listed for each contractor, which includes the bid total and the city's owner's contingency allowance. The actual contract value may vary depending on the final agreement between the city and the selected contractor. Factors that may influence the contract value include the scope of work, materials, and labor costs.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Johnson·Arkansas

Top match · 68%

City Street Overlay and Striping Improvements

Closes 11/5/2026Opened 10/18/2026

City of Kechi·Kansas

68% match

Kechi - 61st Street and Woodlawn Widening

Closes 11/2/2026Opened 10/19/2026

City of Shawnee·Kansas

66% match

Ordinance No. 3499

Closes 8/20/2029Opened 8/20/2024

Kansas Turnpike Authority·Kansas

66% match

Kansas Turnpike Authority Project KTA 8189 – Bridge Painting and Traffic‑Control on I‑335 (Osage & Shawnee Counties)

Closes 11/10/2026Opened 10/14/2026

Missouri Department of Transportation·Missouri

66% match

KC District, City of Gladstone, Improving N. Oak Trafficway from NE 69th Street to NE 72nd.

Closes 11/3/2026Opened 9/24/2026

City of Huron·South Dakota

66% match

2026-03 Milling and Overlay BT

Closes 12/31/2026Opened 2/18/2026

City of Shawnee·Kansas

66% match

Ordinance No. 3492

Closes 7/17/2030Opened 7/16/2024

City of Shawnee·Kansas

66% match

Ordinance No. 3522

Closes 6/3/2033Opened 6/3/2025

Missouri Department of Transportation·Missouri

65% match

KC District, City of Smithville, construction of a single lane roundabout at the intersection of Bridge Street

Closes 11/3/2026Opened 9/30/2026

Nevada Government·Nevada

65% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Fort Wayne·Indiana

65% match

0890C - Eckart St Reconstruction: S Anthony Blvd to Winter St

Closes 11/12/2026Opened 10/29/2026

Kansas Turnpike Authority·Kansas

65% match

KTA 8297 – UBAS Overlay (MM 112‑132)

Closes 11/10/2026Opened 10/14/2026

City of Shawnee·Kansas

65% match

Ordinance No. 3521

Closes 5/20/2031Opened 5/20/2025

Missouri Department of Transportation·Missouri

65% match

KC District, City of Kearney, Mack Porter Park Connector Shared Use Path

Closes 11/3/2026Opened 10/7/2026

City of Slidell·Louisiana

65% match

27-B009 Taxilane Mill and Overlay

Closes 11/10/2026Opened 10/7/2026

Tacoma·Washington

65% match

E Portland Ave (64-72) Overlay

Closes 11/3/2026Opened 9/29/2026

City of Salina·Kansas

65% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%209-8-26

Rolling / TBD closeOpened 9/8/2026

City of Shawnee·Kansas

64% match

Ordinance No. 3509

Closes 10/22/2030Opened 10/22/2024

City of Cedar Rapids·Iowa

64% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

Minnesota Department of Transportation·Minnesota

64% match

260133 SP 1115-28

Closes 11/18/2026Opened 10/21/2026

Shawnee County·Kansas

64% match

Construction of NW Maple Hill over Kansas River

Closes 12/2/2026Opened 10/26/2026

Kansas Department of Transportation·Kansas

64% match

Landscape and Maintenance - D1

Closes 12/10/2026Opened 10/29/2026

City of Palmdale·California

64% match

Arterial Maintenance Overlay PMP

Closes 11/10/2026Opened 10/8/2026

City of Hastings·Nebraska

64% match

E Street Resurfacing - Burlington Ave to Pine Ave CH 2026-57

Rolling / TBD closeOpened 9/18/2026

City of Shawnee·Kansas

64% match

Notice of Hearing - Shawnee Industrial Park - 18760 Johnson Drive

Closes 4/30/2032Opened 4/30/2024