The Bear Lane Waterline Replacement project involves the construction of approximately 1,400 linear feet of flexible pavement for a new 3-lane collection street, as well as the installation of 8" and 12" gate valves, 36" butterfly valves, and other water distribution improvements. The project also includes storm water improvements, such as the installation of 18" and 30" diameter RCP, and wastewater improvements, including the rehabilitation of existing manholes and the installation of cured-in-place pipe. The project has a total base bid of $2,475,922.13. The key work and scope of the project include:
• Construction of flexible pavement for a new 3-lane collection street
• Installation of water distribution improvements, including valves and piping
• Storm water improvements, including RCP installation
• Wastewater improvements, including manhole rehabilitation and CIPP installation
• Traffic control and pavement repair
The project is expected to take 210 calendar days to complete.