The contract involves the installation of a 16-inch ductile iron water main and a 32-inch steel casing in rights-of-way owned by the Town of Marana, Union Pacific Railroad, and the Arizona Department of Transportation. The work includes pipeline installation, casing installation, boring, trenching, backfill, pavement replacement, site restoration, traffic control, quality control, and other related incidental work. The contractor is responsible for investigating, locating, documenting, and avoiding existing underground facilities and utilities, and for making necessary repairs if damage occurs.
• The contract was awarded to multiple vendors, with bid amounts ranging from $545,600.00 to $724,450.00.
• The bid opening took place on August 25, 2016, at 4:00 p.m.
• The contract documents include plans, addenda, and a geotechnical engineering evaluation.
• The contractor is required to comply with all responsibilities and standards for notification of construction, excavation, protection, installation, and the like.