Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Corridor Safety Project – 1st St & Nob Hill Blvd #2357

Awarded contract·City of Yakima·Washington

Corridor Safety Project – 1st St & Nob Hill Blvd #2357

Won by Columbia Asphalt & Gravel, Inc.$341kAwarded 4/28/2015Single Award
Contract source

Awarded vendors

  • Columbia Asphalt & Gravel, Inc.

Description

This municipal contract awards the design‑build of a corridor safety improvement at the intersection of 1st Street and Nob Hill Boulevard in Yakima, Washington. The scope includes demolition of existing concrete sidewalks and curbs, new HMA pavement, installation of concrete curb and gutter, construction of curb ramps for accessibility, and the addition of modern traffic control devices such as LED luminaires, countdown pedestrian signals, and radar speed display signs. The project is funded partially with federal aid (POMVIP‑000S(369)) and was competitively bid, with Columbia Asphalt & Gravel, Inc. selected as the prime contractor. The bid schedule lists 22 line‑item categories, each expressed with unit quantities and prices, indicating a unit‑price pricing structure. The total projected cost tops out at approximately $341,374.64. • Roadway and sidewalk reconstruction with concrete curb‑infrastructure. • Installation of advanced traffic‑signal hardware (LED, countdown, radar). • Federal‑aid funded safety upgrade at a key urban intersection.

Attached files

Key dates

Bids closed
4/16/2015
Intent to award
4/28/2015
Awarded
4/28/2015

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
Project #2357

Contract value

$341,374

The bid summary lists five cumulative totals, with the highest being $341,374.64. This appears to be the ceiling bid amount for the winning contractor. No separate line‑item subtotals exceed this figure, and the document does not provide a separate “contract value” field. Therefore the best estimate of the contract’s dollar value is the maximum total disclosed: roughly $341,000. This estimate assumes the award is at the top of the range and includes all labor, materials, equipment, and overhead captured in the line‑item totals.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of San Diego·California

Top match · 69%

Gompers Prep 47th St Safety Enhancement

Closes 11/19/2026Opened 10/20/2026

City of Oakland·California

69% match

TELEVISION & PRODUCTION EQUIPMENT AND ACCESSORIES - 840.86 VIDEO SYSTEMS

Closes 11/19/2026Opened 10/23/2026

Maryland State Highway Administration·Maryland

68% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

City of Harrisonburg·Virginia

68% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

Maryland State Highway Administration·Maryland

68% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

Nyc Department of Design and Construction·New York

68% match

85026B0094 - HWCSCHPQN - SAFE ROUTES TO SCHOOLS, QUEENS

Closes 11/9/2026Opened 6/22/2026

City of Oakland·California

67% match

NTB 1008513 Embarcadero West Rail Safety Project - Near-Term Improvements (NTI)

Closes 11/12/2026Opened 10/9/2026

City of Pasadena·California

67% match

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

City of Rancho Cordova·California

67% match

Traffic Safety Action Plan

Closes 11/13/2026Opened 10/9/2026

Missouri Department of Transportation·Missouri

67% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Charlotte·North Carolina

67% match

Safe Streets for All (SS4A) Phase 1

Rolling / TBD closeOpened 4/1/2026

City of Ridgeland·Mississippi

67% match

West Jackson Street Corridor Demonstration Project

Closes 11/6/2026Opened 10/16/2026

City of Charlotte·North Carolina

67% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

City of Charlotte·North Carolina

67% match

Nevin Rd and W Sugar Creek Rd ITS

Rolling / TBD closeOpened 1/1/2027

Missouri Department of Transportation·Missouri

67% match

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

Sterling Heights·Michigan

67% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

City of Minneapolis·Minnesota

67% match

BID-PW - Folwell Safe Routes to School

Closes 11/12/2026Opened 9/29/2026

City of Boynton Beach·Florida

67% match

SAFE STREETS 4 ALL SAFETY ACTION PLAN

Closes 11/17/2026Opened 10/21/2026

Massachusetts Department of Transportation·Massachusetts

67% match

616377 DISTRICT 1 Scheduled and Emergency Guardrail and Fence Repairs at Various Locations on I-90

Closes 11/3/2026Opened 10/13/2026

Virginia Department of Transportation·Virginia

67% match

B33_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

City of Charlotte·North Carolina

67% match

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)

Rolling / TBD closeOpened 2/1/2027

Idaho Transportation Department·Idaho

67% match

Key No. 23883 2ND STREET S SAFETY IMPROVEMENTS

Closes 11/3/2026Opened 10/10/2026

Virginia Department of Transportation·Virginia

67% match

B36_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

City of Cedar Rapids·Iowa

67% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

NYS PRIDE of Ticonderoga·New York

66% match

NYS CDBG Residential Rehabilitation Project

Closes 11/16/2026Opened 10/23/2026