Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Illinois
  4. ›Water and Wastewater
  5. ›RAS Pump Replacement Phase 2

Awarded contract·Four Rivers Sanitation Authority·Illinois

RAS Pump Replacement Phase 2

Won by Civil Constructors$8MSingle Award
Contract source

Awarded vendors

  • Civil Constructors

Description

The Rock River Water Reclamation District issued a public bid (19‑409) for the replacement of its return‑activated‑sludge (RAS) pump system – Phase 2 – at the 3333 Kishwaukee St treatment plant in Rockford, IL. The scope involves demolition of five existing pump houses, removal of ten sub‑mersible pumps and associated motors, de‑watering of clarifier tanks, installation of ten new stainless‑steel RAS pumps, fourteen new variable‑frequency drives (VFDs), extensive concrete work, new piping, valve and hydrant installation, and full electrical/controls upgrades. The project also requires temporary facilities, utility locates, and strict sequencing (48‑hr tank‑down notice, 24‑hr offline window). The contract is a lump‑sum solicitation with a 5 % bid bond, 10 % retention, and $300 per day liquidated‑damage for late completion. The anticipated final close‑out is July 31 2020.

Attached files

Key dates

Bids closed
5/29/2019
Contract modified
5/16/2019
Ends
7/31/2020

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237130
Solicitation №
19-409

Contract value

$8,000,000

The documents detail extensive demolition, concrete work, installation of ten 16‑HP sub‑mersible pumps, fourteen VFDs, new piping, valves, hydrants, and full electrical upgrades. Similar water‑treatment pump‑replacement projects in the Midwest typically range from $5 million to $12 million depending on site conditions, equipment costs, and labor rates. Given the size of the plant (multiple pump houses, large concrete slabs, and a full set of VFDs), a reasonable midpoint estimate is around $8 million. This accounts for equipment procurement (≈ $3–4 M), civil/structural work (≈ $2–3 M), electrical/control systems (≈ $1–1.5 M), and contingency/overheads.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Upper Occoquan Service Authority·Virginia

Top match · 65%

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of Branson·Missouri

64% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

City of San Diego·California

63% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

62% match

16--PUMP,AXIAL PISTONS - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

62% match

PUMP UNIT,ROTARY

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

62% match

PUMP,ROTARY

Closes 11/2/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

62% match

43--PUMP UNIT,ROTARY

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

62% match

PUMP UNIT,ROTARY

Closes 11/16/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

62% match

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/15/2026

Metropolitan Council·Minnesota

61% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

61% match

43--PUMP,ROTARY

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

61% match

43--PUMP UNIT,ROTARY

Closes 11/1/2026Opened 10/20/2026

LA General Services·California

61% match

PUMPS AND PARTS, MFR.: VARIOUS

Closes 11/10/2026Opened 10/27/2026

U.S. Department Of Defense·Oklahoma

61% match

PUMP, RECIPROCATING, NSN# 4320012622626FW, PN# UA538823-4

Closes 11/3/2026Opened 10/16/2026

City of Rochester·New Hampshire

61% match

Bid 27-09 Ryan Circle Pump Station Upgrade

Closes 11/18/2026Opened 10/9/2026

City of Hollywood·Florida

61% match

SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)

Closes 11/25/2026Opened 10/20/2026

Town of Jupiter·Florida

61% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

61% match

43--PUMP,RECIPROCATING, IN REPAIR/MODIFICATION OF

Closes 11/27/2026Opened 10/27/2026

U.S. Department Of Defense·Oregon

60% match

Bonneville Powerhouse II Unwatering Pump Replacement

Closes 8/21/2027Opened 8/21/2026

U.S. Department Of Defense·United States of America

60% match

29--PUMP ASSEMBLY

Closes 11/8/2026Opened 10/27/2026

City of Key West·Florida

60% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

East Bay Municipal Utility District·California

60% match

RFP - Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services

Closes 11/11/2026Opened 10/1/2026

City of Redding·California

60% match

Overhaul of Two (2) Boiler Feedwater Pumps, Motors & Valves

Closes 12/4/2026Opened 10/26/2026

U.S. Department Of Defense·Washington

60% match

43--PUMP,ROTARY

Closes 11/1/2026Opened 10/22/2026

City of Rockford·Illinois

60% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026