This contract pertains to the replacement of a 12‑inch ductile‑iron water main along North 6th Street in Fort Smith, AR. The scope includes extensive civil‑construction activities such as site preparation, traffic control, removal and disposal of existing pavements, excavation, installation of steel‑cased and ductile‑iron pipe, placement of fire hydrants, water‑meter boxes, and a full suite of concrete and asphalt pavement work. The bid tabulation lists detailed unit‑price items covering labor, materials, and equipment, reflecting a comprehensive water‑distribution infrastructure upgrade.
• Primary work: 12‑inch water main replacement with ancillary utilities (valves, hydrants, meter boxes).
• Major components: excavation, pipe installation, concrete/asphalt paving, traffic management, and utility connections.
• Competitive environment: three bidders submitted proposals, with a total winning bid value of approximately $1.57 M.