Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Index-Galena Road Flood Repair

Awarded contract·Snohomish County·Washington

Index-Galena Road Flood Repair

Won by Goodfellow Bros. LLC$18.1MAwarded 2/24/2021Single Award
Contract source

Awarded vendors

  • Goodfellow Bros. LLC

Description

This contract awards the design‑build flood‑repair and reconstruction of approximately one mile of Index‑Galena Road (MP 6.4‑6.9) within the Mt. Baker‑Snoqualmie National Forest. The scope includes the construction of a 180‑ft bridge, a box‑culvert vented ford, geosynthetic‑reinforced slopes, structural earth walls, removal of an abandoned road segment, and logging of fourteen acres of timber, together with associated earthwork, drainage, erosion‑control, and roadway surfacing. Funding is sourced from Federal Highway Administration Emergency Relief Funds, FHWA Federal Lands Access Program Funds, Rural Arterial Program Funds, and Snohomish County Road Funds. The procurement was conducted as a public‑works, full‑open competition bid, with Goodfellow Bros. LLC selected as the low‑bid awardee at a lump‑sum price of $18,105,074.

Attached files

Key dates

Bids closed
2/9/2021
Intent to award
2/24/2021
Awarded
2/24/2021
Contract modified
2/9/2021
Starts
2/24/2021

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
PW-001-21SB

Contract value

$18,105,074

The Engineer’s Estimate for the project is $21,974,627.25, while the lowest bid (Goodfellow Bros. LLC) was $18,105,074. The award amount therefore is approximately $18.1 million. Given the scope—bridge construction, extensive earthwork, drainage, erosion control, and timber removal—the contract value aligns with typical medium‑size highway reconstruction projects in Washington State, which normally range from $15 M to $25 M.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Hesperia·California

Top match · 72%

2025 DECEMBER ADVERSE WEATHER EMERGENCY REPAIRS: CEDAR STREET AND BANDICOOT TRAIL

Closes 11/12/2026Opened 9/23/2026

Massachusetts Department of Transportation·Massachusetts

72% match

616396 DISTRICT 1 Scheduled and Emergency Drainage, Slope, and Roadway Repairs/Improvements at Var

Closes 11/17/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

71% match

Arcadia Wet Well Rehabilitation

Closes 11/9/2026Opened 10/8/2026

County of Santa Cruz·California

71% match

Eureka Canyon Road PM 8.11 and 8.39 Storm Damage Repair Projects

Closes 11/5/2026Opened 10/8/2026

NYS OGS Design & Construction - Construction Contractors·New York

71% match

Rehabilitate Floodwalls – Project 46196‑C (Cheektowaga, NY)

Closes 11/18/2026Opened 10/13/2026

U.S. Department Of Defense·Missouri

70% match

Corning and Holt 10 Levee Repairs

Closes 7/21/2027Opened 7/21/2026

City of Cedar Rapids·Iowa

70% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Federal Emergency Management Agency·Arkansas

70% match

Proposed Flood Hazard Determinations for the City of Jacksonville, Pulaski County, Arkansas

Rolling / TBD closeOpened 8/28/2026

U.S. Department Of Defense·Pennsylvania

70% match

Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation

Closes 11/23/2026Opened 10/22/2026

U.S. Department of Homeland Security - FEMA·United States of America

70% match

Fiscal Year 2024 Flood Mitigation Assistance

Rolling / TBD closeOpened 1/6/2025

City of Vernon·California

70% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

Sterling Heights·Michigan

70% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

City of Cedar Rapids·Iowa

70% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

70% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

70% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Canton·Georgia

70% match

Professional Emergency Repair Services for On-Call Water, Sanitary Sewer, and Stormwater

Closes 12/11/2026Opened 10/29/2026

Georgia Department of Transportation·Georgia

69% match

T32-D3-Drain. Rehab-SR401 Spalding-194526

Closes 11/12/2026Opened 10/28/2026

LA County Public Works·California

69% match

On-Call Emergency Facilities Repair Services Program for Stormwater Maintenance Division

Closes 11/4/2026Opened 9/23/2026

Hamilton County, IN·Indiana

69% match

Public Safety Training Center Roadway and Levee

Closes 11/8/2026Opened 10/26/2026

U.S. Department of Homeland Security - FEMA·United States of America

69% match

Fiscal Year 2026 Flood Mitigation Assistance

Closes 2/26/2027Opened 10/22/2026

City of Lebanon·Indiana

69% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

City of Charlotte·North Carolina

69% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Cedar Rapids·Iowa

69% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Coronado·California

69% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026

City of Indianapolis·Indiana

69% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026