The Juneau International Airport Riverbank Stabilization project aims to stabilize the eroded section of streambank along the Mendenhall River by constructing a riprap revetment. The project is located at the Juneau International Airport off the end of runway 8 adjacent to the emergency vehicle access road (EVAR)/Airport Dike Trail. The contract was awarded to Island Contractors, Inc. with a total bid of $258,405.00. The scope of work includes mobilization and demobilization, rehabilitation of existing gravel access road, construction surveying, traffic control, unclassified excavation and onsite disposal or reuse, erosion and sediment control, primary armor stone, and underlayer stone.
• The project is located at the Juneau International Airport.
• The contract was awarded to Island Contractors, Inc.
• The total bid amount is $258,405.00.
• The scope of work includes mobilization and demobilization, rehabilitation of existing gravel access road, construction surveying, traffic control, and more.