Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alaska guideAlaska Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alaska
  4. ›Construction
  5. ›FedEx Hanger Floor Slab Joint and Crack Repair

Awarded contract·Alaska Energy Authority·Alaska

FedEx Hanger Floor Slab Joint and Crack Repair

Won by MB General Contractor$70kAwarded 8/16/2017Single Award
Contract source

Awarded vendors

  • MB General Contractor

Description

This contract calls for the repair and sealing of concrete slab‑on‑grade joints and cracks within a FedEx Line Maintenance Hangar at Anchorage International Airport. The work is confined to the hanger footprint, must not interfere with aircraft operations, and requires the use of specified Sika® or approved BASF sealants and spall‑repair procedures compliant with UFC 3‑270‑03. The contractor must provide qualified supervision, obtain airport security badges, and complete the work by the end of September 2017. • Scope: Concrete joint and crack repair, spall remediation, sealant replacement (~4,160 ft), and cleaning of fuel/hydraulic fluid contamination. • Materials: Approved Sika products or BASF Master‑Builders alternatives; optional D.S. Brown Delpatch elastomeric concrete as an alternate. • Requirements: 24/7 airport access with badge, one‑year warranty, compliance with Alaska prevailing‑wage rules, and insurance minimums.

Attached files

Key dates

Bids closed
8/16/2017
Intent to award
8/16/2017
Awarded
8/16/2017
Contract modified
8/14/2017
Ends
9/30/2017
Duration
45 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
236220
Solicitation №
Solicitation No. 18015

Contract value

$70,000

The solicitation’s cost estimate brackets range from under $10,000 up to $100,000, and the bid abstract shows individual offers between $2,700 and $87,006, with a total competitive bid around $68,660. Taking the median of the provided ranges and the typical industry cost for 4,160 ft of sealant plus spall repair, a reasonable ball‑park is roughly $70,000. This figure aligns with the “under $100,000” estimate category and reflects the limited scope (only joint and crack repair, no full‑scale reconstruction).

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Port of Portland·Oregon

Top match · 69%

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

Corrections and Community Supervision, NYS Dept. of·New York

68% match

Repair Cooler Floor

Closes 11/5/2026Opened 10/15/2026

Raleigh Durham Airport Authority·North Carolina

67% match

Taxiway F Pavement Repairs - 2026

Closes 11/9/2026Opened 10/8/2026

Niagara Frontier Transit Authority (NFTA)·New York

66% match

10LZ2413 - LRRT Capital Repairs 2026

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Defense·Wisconsin

66% match

NEW - FLOORING IDIQ FY27-FY30

Closes 11/13/2026Opened 10/14/2026

Port of Tacoma·Washington

66% match

TOTE Terminal Pavement Maintenance and Repair (2026)

Closes 11/17/2026Opened 10/31/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

66% match

Building Repairs and Maintenance - Central Warehouse

Closes 11/5/2026Opened 10/27/2026

U.S. Department Of Defense·Georgia

65% match

Repair/Overhaul of Flat Panel Up Front Controller (FPUFC)

Closes 11/25/2026Opened 4/29/2026

City of Mobile·Alabama

65% match

Critical Repair - 1157 Ghent St. - Roof Replacement

Closes 11/4/2026Opened 10/21/2026

Tacoma·Washington

64% match

Keith Walking Floor Repairs and Parts

Closes 11/17/2026Opened 10/29/2026

Port of Portland·Oregon

64% match

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

Illinois Tollway·Illinois

64% match

RR-26-2069 - Systemwide Pavement Repairs

Closes 12/10/2026Opened 10/31/2026

Ontonagon County Road Commission·Michigan

64% match

Ontonagon County Road Commission Bergland Garage No. 3 Building Repairs

Closes 11/10/2026Opened 10/17/2026

City of Charlotte·North Carolina

64% match

PCC Slab Replacement Program

Rolling / TBD closeOpened 8/3/2026

Southwest ISD·Texas

64% match

Warehouse Freezer Refrigeration Repair and Ceiling Support Retrofit

Closes 11/9/2026Opened 10/26/2026

U.S. Department Of Defense·Georgia

64% match

Repair/Overhaul of Flat Panel Up Front Controller (FPUFC)

Closes 11/25/2026Opened 9/29/2026

Texarkana Regional Airport·Arkansas

63% match

Texarkana Regional Airport – Restore and Reseal Exterior Wood Surfaces

Rolling / TBD closeOpened 9/20/2026

NYS The M-ARK Project Inc·New York

63% match

NYMS Fleischmanns 973 Main Street

Closes 11/16/2026Opened 10/23/2026

City of Key West·Florida

63% match

Recording Studio Structural Improvement

Closes 11/18/2026Opened 10/8/2026

Sarasota County·Florida

63% match

Interior Facility Repairs - Youth Athletic Complex

Closes 11/5/2026Opened 10/5/2026

City of St. Petersburg·Florida

63% match

St. Petersburg Pier Pile Repairs

Closes 11/5/2026Opened 10/27/2026