The contract is for the replacement of the electrical system at the Gateway Residential facility. The project estimate is between $225,000 and $249,000. The contract was awarded through an Invitation to Bid (ITB) process, and the preliminary tabulation of bids lists two bidders. The contract requires the bidder to provide a bid bond, performance bond, and payment bond. The bidder must also comply with prevailing wage rates and responsible business practices.
• The project involves the replacement of the electrical system at the Gateway Residential facility.
• The project estimate is between $225,000 and $249,000.
• The contract was awarded through an Invitation to Bid (ITB) process.
• The preliminary tabulation of bids lists two bidders: Portland Electrical Construction and Buildskape LLC.
• The contract requires the bidder to provide a bid bond, performance bond, and payment bond.
• The bidder must also comply with prevailing wage rates and responsible business practices.