The University of Akron is seeking proposals to remove a problematic process chiller from the Timken Engineered Surfaces Labs and replace it with a new unit. The installation of the new chiller unit will require modifications to the existing chilled water supply and return piping system, the refrigerant piping loop, and the associated electrical power circuit(s). The estimated value of the base bid scope of work is $33,000, and the estimated value for the alternate scope of work is $8,000. Key aspects of the contract include:
• Chiller replacement
• Modifications to existing piping and electrical systems
• Installation of new chiller unit
• Removal and disposal of existing chiller unit
• Estimated base bid value: $33,000
• Estimated alternate scope of work value: $8,000