The City of Wilmington is replacing the hydronic heating and cooling loops serving Thalian Hall. The scope includes removing existing chiller and boiler loop piping, installing new pipe (cast‑iron, copper, or alternate material per bidder), adding shut‑off valves in the mechanical room and at each fan‑coil unit, insulating the new pipe with 2‑in. non‑asbestos insulation, painting insulation black, labeling each loop, and coordinating shutdown/start‑up with city staff while minimizing HVAC downtime. Bidders must provide insurance, workers‑comp, licensing, and meet MBE/DBE participation guidelines. The contract was awarded on a sealed‑bid basis to Schneider Electric Buildings Americas, Inc. for a base price of $14,280, with optional alternates.
• Full replacement of HVAC loop piping (≈ 420 LF total)
• Installation of isolation valves and 2‑in. insulated, painted pipe
• Required compliance with city insurance, licensing, and minority‑business participation policies