The Whitney Boulevard Water Main Replacement Project involves the construction of an 18-inch ductile iron waterline along the alignment described in the contract drawing. The project includes piping, fittings, valves, water quality sampling stations, fire hydrant reconnections, and tie-in connections to existing facilities. The estimated cost of construction is $3,839,000, and the project duration is 180 calendar days. The successful bidder must possess a valid California Class A-General Engineering Contractor's license and comply with prevailing wage rates and labor laws.
• The project requires the construction of a new water main replacement.
• The estimated cost of construction is $3,839,000.
• The project duration is 180 calendar days.
• The successful bidder must possess a valid California Class A-General Engineering Contractor's license.
• The project is subject to compliance with prevailing wage rates and labor laws.