Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wyoming guideWyoming Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wyoming
  4. ›Construction
  5. ›AML 67-NC, Paris Lode and Leighton-Gentry Mine Hazard…

Awarded contract·Wyoming Department of Environmental Quality·Wyoming

AML 67-NC, Paris Lode and Leighton-Gentry Mine Hazard Mitigation Project - Dept of Environmental Quality

Won by P.E. Grosch Construction +2 more$450kMultiple Award
Contract source

Awarded vendors

  • P.E. Grosch Construction
  • The 5 Seventeen Co
  • WyoDak Energy Services

Description

The contract is for the AML 67-NC, Paris Lode and Leighton-Gentry Mine Hazard Mitigation Project. The project involves installing 2 batgate closures and 11 PUF closures over mine openings at two abandoned copper mines. The work site is located approximately 14 miles west of Encampment, WY. The contract was awarded to WyoDak Energy Services for a total bid amount of $449,560.00. The project is funded in whole or in part with a grant from the Department of Interior. • The project requires the installation of batgate closures and PUF closures over mine openings. • The work site is located approximately 14 miles west of Encampment, WY. • The contract was awarded to WyoDak Energy Services. • The project is funded in whole or in part with a grant from the Department of Interior. • The contract requires the contractor to attend a mandatory pre-bid meeting and to submit a bid bond. • The contract also requires the contractor to comply with all applicable laws and regulations.

Attached files

Key dates

Starts
9/1/2025

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
25-0553

Contract value

$449,560

The contract value is estimated to be $449,560.00, which is the total bid amount awarded to WyoDak Energy Services. This estimate is based on the information provided in the contract award document. The factors that influence the contract value include the scope of work, the materials and labor required, and the location of the project.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Pennsylvania Department of Environmental Protection·Pennsylvania

Top match · 71%

AMRP, Rocky Glen Pond, Moosic Bgh, Lackawanna Cnt

Closes 12/3/2026Opened 10/30/2026

West Virginia Department of Environmental Protection·West Virginia

71% match

AML - Shinnston (Sheppard) Mine Drainage

Closes 11/20/2026Opened 10/14/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

71% match

AMR, Cambria & Westmoreland Cnties

Closes 11/12/2026Opened 10/16/2026

U.S. Department Of Defense·United States of America

71% match

Region 7 Southeast Mines Superfund Site

Closes 11/6/2026Opened 10/21/2026

North Dakota Public Service Commission·North Dakota

70% match

Cartwright AML Project; 408.26.10.006

Closes 11/17/2026Opened 10/19/2026

West Virginia Department of Environmental Protection – Office of Abandoned Mine Lands & Reclamation·West Virginia

70% match

AML - Summerlee AMD Treatment

Closes 11/12/2026Opened 10/6/2026

Wyoming State Construction Department·Wyoming

68% match

AML Project 87, Phase I – Hanna Roadway Infrastructure Repair - Dept of Environmental Quality

Closes 12/9/2026Opened 10/23/2026

City of Morgantown·West Virginia

68% match

Asbestos Abatement & Demolition of Multiple Structures & Restoration of Land

Closes 11/16/2026Opened 10/30/2026

U.S. Department Of The Interior·Washington

68% match

C--GEOTECHNICAL ARCHITECTURE AND ENGINEER SERVICES IN

Closes 11/21/2026Opened 10/21/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

68% match

Abandoned Mine Reclamation Project – North Liberty South (Slippery Rock Township, Butler County & Liberty Township, Mercer County)

Closes 12/3/2026Opened 10/30/2026

Chittenden County Regional Planning Commission·Vermont

68% match

2027 Chittenden County Multi-Jurisdictional Hazard Mitigation Plan Update

Closes 12/4/2026Opened 10/29/2026

Alaska Department of Natural Resources, Division of Mining, Land & Water·Alaska

67% match

ADL 422937 – Notice of contract issuance - Division of Parks – MP 277 Richardson Highway

Rolling / TBD closeOpened 8/7/2026

U.S. Department Of Transportation·Washington

67% match

WY MT NP MULTI PMS(1), Pavement Preservation Wyoming and Montana

Closes 7/16/2028Opened 7/16/2026

West Virginia Department of Environmental Protection·West Virginia

67% match

AML- Simpson Creek Highwall, Tipple and Portals Phase II

Closes 11/23/2026Opened 10/26/2026

West Virginia Department of Environmental Protection·West Virginia

67% match

AML- Enterprise Portal

Closes 11/19/2026Opened 10/19/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

67% match

Abandoned Mine Reclamation Project – South Nanty Glo 2

Closes 11/12/2026Opened 10/16/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

67% match

AMLRP w/ PTS, State Game Lands 332, Indiana Cnty

Closes 11/12/2026Opened 10/16/2026

West Virginia Department of Environmental Protection·West Virginia

67% match

AML- Enterprise Portal

Closes 11/19/2026Opened 10/15/2026

State of Colorado Department of Local Affairs (Division of Housing)·Colorado

67% match

Ft Lyon Inspection, Lab Analysis & Testing

Closes 11/2/2026Opened 10/30/2026

U.S. Department Of The Interior·Colorado

67% match

Y--VICK 209252 Stabilize Mint Spring Bayou & VICK 310725/324137 Stabilize Terraces

Closes 3/13/2027Opened 3/13/2025

Pennsylvania Department of Environmental Protection·Pennsylvania

67% match

Abandoned Mine Lands Reclamation Project with Passive Treatment System – State Game Lands 332, Indiana County, PA

Closes 11/12/2026Opened 10/16/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Pennsylvania

67% match

Preventative Maintenance and Repair of Heavy Equipment for the Fort Mifflin Project Office

Closes 11/23/2026Opened 9/30/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

66% match

Abandoned Mine Reclamation Project – Rocky Glen Pond, Moosic Borough, Lackawanna County

Closes 12/3/2026Opened 10/30/2026

Department of Natural Resources·Minnesota

66% match

State Fair Fire Prevention Building Drainage Correction

Closes 11/17/2026Opened 10/29/2026