The Warm Beach Water System Water Replacement Project involves the installation of approximately 4,734 linear feet of eight-inch ductile iron water main and associated fittings, as well as 6 new fire hydrant assemblies and appurtenances. The project also includes asphalt trench patching, asphalt restoration overlay, and private asphalt, concrete, and gravel driveway removal and restoration. The primary purpose of the project is to replace aging and undersized water system infrastructure. The contract was awarded to B & L Utility, Inc. with a bid amount of $1,282,671.11. The project is funded through the Washington State Drinking Water State Revolving Loan program with federal funds from the Environmental Protection Agency.
• The project involves the replacement of aging and undersized water system infrastructure
• The contract was awarded to B & L Utility, Inc. with a bid amount of $1,282,671.11
• The project is funded through the Washington State Drinking Water State Revolving Loan program
• The project includes various components such as water main installation, fire hydrant assemblies, and asphalt restoration
• The project is subject to Davis-Bacon/Prevailing Wage requirements and must meet the higher of the prevailing state or federal wage rates