Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›PWC - WB CIP #54 DWSRF DWL23475 AND DWL23480, WARM BEACH…

Awarded contract·Snohomish County PUD·Washington

PWC - WB CIP #54 DWSRF DWL23475 AND DWL23480, WARM BEACH WATER SYSTEM WATER REPLACEMENT PROJECT

Won by B & L Utility, Inc.$1.3MSingle Award
Contract source

Awarded vendors

  • B & L Utility, Inc.

Description

The Warm Beach Water System Water Replacement Project involves the installation of approximately 4,734 linear feet of eight-inch ductile iron water main and associated fittings, as well as 6 new fire hydrant assemblies and appurtenances. The project also includes asphalt trench patching, asphalt restoration overlay, and private asphalt, concrete, and gravel driveway removal and restoration. The primary purpose of the project is to replace aging and undersized water system infrastructure. The contract was awarded to B & L Utility, Inc. with a bid amount of $1,282,671.11. The project is funded through the Washington State Drinking Water State Revolving Loan program with federal funds from the Environmental Protection Agency. • The project involves the replacement of aging and undersized water system infrastructure • The contract was awarded to B & L Utility, Inc. with a bid amount of $1,282,671.11 • The project is funded through the Washington State Drinking Water State Revolving Loan program • The project includes various components such as water main installation, fire hydrant assemblies, and asphalt restoration • The project is subject to Davis-Bacon/Prevailing Wage requirements and must meet the higher of the prevailing state or federal wage rates

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
22-1235-KS

Contract value

$1,282,671

The contract value is estimated to be around $1,282,671.11, which is the bid amount submitted by B & L Utility, Inc. This estimate is based on the bid results provided in the contract document. The total contract value may include additional costs such as mobilization, equipment, and labor, but the bid amount provides a reasonable estimate of the contract value.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of San Diego·California

Top match · 72%

Otay WTP Raw Water PS Switchboard Replacement - ADVERTISEMENT ONLY

Closes 12/8/2026Opened 10/28/2026

U.S. Department Of Veterans Affairs·Missouri

72% match

657-27-107JC, Replace Select Hot Water Heating System

Closes 11/3/2026Opened 9/28/2026

U.S. Department Of Defense·North Carolina

72% match

Building SH50 Replace Water Source Heat Pump

Closes 11/19/2026Opened 10/30/2026

U.S. Department Of Defense·U.S. Armed Forces – Pacific

72% match

PMP for Water Facilities Circulation Systems

Closes 1/9/2027Opened 12/2/2025

LA Water & Power·California

71% match

146409 WATER SOFTENER SYSTEM - RINALDI TOLUCA Chlorination Station

Closes 11/13/2026Opened 9/23/2026

University of Massachusetts System·Massachusetts

71% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

City of Hollywood·Florida

71% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Neptune Beach·Florida

71% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

City of Redlands·California

71% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Troy, OH·Ohio

71% match

Miami Shores Golf Course Pump Control Panel and Well Project

Closes 11/4/2026Opened 10/14/2026

Bristol Virginia Utilities Authority·Virginia

71% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

City of San Clemente·California

71% match

WRP Grit Classifier Replacement Project

Closes 11/19/2026Opened 10/22/2026

City of Wilmington·Delaware

71% match

25035PW-R – Porter Water Filter Plant Electrical Upgrade Project

Closes 11/3/2026Opened 10/8/2026

State of Michigan·Michigan

71% match

171/23125.CTS; Jerome Hart Building - Chilled Water Upgrades

Closes 11/11/2026Opened 10/23/2026

State of Michigan Department of Technology, Management and Budget·Michigan

70% match

472/26279.JLM; Lakeland C.F. - Softener & Salt Storage Upgrd

Closes 11/11/2026Opened 10/16/2026

LA Water & Power·California

70% match

146976 JOINT, INLET EXPANSION REPLACEMENT

Closes 11/6/2026Opened 10/24/2026

Palm Beach County Water Utilities Department·Florida

70% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 9/23/2026

U.S. Department Of Defense·District of Columbia

70% match

N0017327Q5317- Roof Membrane Replacement and Waterproofing

Closes 11/6/2026Opened 10/27/2026

The Metropolitan Water District of Southern California·California

70% match

Western Region Security Upgrade

Closes 11/19/2026Opened 9/24/2026

Palm Beach County Water Utilities Department·Florida

70% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 10/1/2026

State of Hawaii Department of Transportation – Harbors Division·Hawaii

70% match

P10904 Domestic & Fire Waterline Systems Replacement Pier 51A

Closes 12/3/2026Opened 10/8/2026

Georgia City of Cartersville·Georgia

70% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Nevada Adjutant General·Nevada

70% match

OTAG Water Heater Replacement

Closes 11/24/2026Opened 10/23/2026

U.S. Department Of The Interior·California

70% match

CA-SAN LUIS NWR-FIRE SYSTEM REHAB

Closes 11/30/2026Opened 10/29/2026

Oregon Parks and Recreation Department·Oregon

70% match

14546 Jessie M. Honeyman SP Water Intake Replacement (Construction)

Closes 11/2/2026Opened 10/7/2026