Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›BASIN 1 STORMWATER TREATMENT PROJECT

Awarded contract·City of Palm Bay·Florida

BASIN 1 STORMWATER TREATMENT PROJECT

Won by Jobear Contracting, Inc. +2 more$292kMultiple Award
Contract source

Awarded vendors

  • Jobear Contracting, Inc.
  • Don Luchetti Construction, Inc.
  • Gregori Construction, Inc.

Description

The Basin 1 Stormwater Treatment Project is a construction project located in the City of Palm Bay, Florida. The project aims to reduce pollutant loading and silt entering the Indian River Lagoon by implementing multiple Best Management Practices (BMPs) and innovative techniques. The project includes the installation of a 2nd Generation Nutrient Separating Baffle Box and an up-flow filtration system and/or a modular wetland system. The contract was awarded to three vendors: Jobear Contracting, Inc., Don Luchetti Construction, Inc., and Gregori Construction, Inc. The project has an engineer estimate of $243,000. • The project is located in the City of Palm Bay, Florida. • The project aims to reduce pollutant loading and silt entering the Indian River Lagoon. • The project includes the installation of a 2nd Generation Nutrient Separating Baffle Box and an up-flow filtration system and/or a modular wetland system. • The contract was awarded to three vendors. • The project has an engineer estimate of $243,000.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
26-0-2017

Contract value

$291,503

The contract value can be estimated based on the bids submitted by the vendors. The lowest bid is $291,502.50, and the highest bid is $383,118.00. Considering the engineer estimate of $243,000, it is likely that the contract value is around $291,502.50, which is the lowest bid.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Cape Canaveral·Florida

Top match · 72%

Stormwater Pilot Project

Closes 11/12/2026Opened 10/15/2026

City of Coronado·California

70% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026

City of Charlotte·North Carolina

70% match

Irwin Creek WWTP Stormwater Improvements Project

Rolling / TBD closeOpened 5/1/2026

Georgia City of Byron·Georgia

70% match

Stormwater Program Management

Closes 11/19/2026Opened 10/20/2026

Johnson County·Kansas

70% match

Stormwater Management Program

Closes 12/1/2026Opened 10/27/2026

Town of Westwood·Massachusetts

69% match

Catch Basin Cleaning

Rolling / TBD closeOpened 9/9/2026

California Department of Transportation·California

69% match

Construct treatment BMPs for stormwater mitigation.

Closes 11/19/2026Opened 10/12/2026

City of Shawnee·Kansas

69% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Charlotte·North Carolina

69% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

West County Wastewater·California

68% match

Secondary Sedimentation Basins Upgrades Project - Short-term Improvements for Basins (1) & (2)

Closes 12/16/2026Opened 10/27/2026

James City County·Virginia

68% match

GROVE NEIGHBORHOOD STORMWATER AND SANITARY SEWER IMPROVEMENTS

Closes 11/12/2026Opened 10/21/2026

City of Charlotte·North Carolina

68% match

Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/4/2027

City of Waco·Texas

68% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

City of Charlotte·North Carolina

68% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

City of West Miami·Florida

68% match

West Miami - City-Wide Stormwater Master Plan

Closes 11/24/2026Opened 10/22/2026

Port of Brookings Harbor·Oregon

68% match

BOAT YARD STORMWATER IMPROVEMENTS PROJECT

Closes 12/2/2026Opened 10/28/2026

City of Cape Canaveral·Florida

68% match

Fillmore Avenue Townhomes Stormwater Construction

Closes 11/5/2026Opened 10/8/2026

Pee Dee Regional Council of Governments·South Carolina

68% match

Stormwater Drainage Study

Closes 12/1/2026Opened 10/20/2026

City of Charlotte·North Carolina

68% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

Georgia City of Covington·Georgia

68% match

2026-26 Annual Stormwater Rehabilitation and Maintenance Construction Services

Closes 1/12/2027Opened 10/20/2026

City of Charlotte·North Carolina

68% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Yuba City·California

68% match

NORTH GILSIZER DETENTION BASIN IMPROVEMENTS PROJECT

Closes 11/5/2026Opened 10/15/2026

Covington Municipality·Rhode Island

68% match

088-26-GREEN INFRASTUCTURE STORMWATER PROJECT DESIGN

Closes 11/2/2026Opened 11/2/2026

Washougal, WA·Washington

67% match

Stormwater Filter Facility Maintenance

Closes 11/5/2026Opened 10/9/2026

City of Charlotte·North Carolina

67% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027