The Basin 1 Stormwater Treatment Project is a construction project located in the City of Palm Bay, Florida. The project aims to reduce pollutant loading and silt entering the Indian River Lagoon by implementing multiple Best Management Practices (BMPs) and innovative techniques. The project includes the installation of a 2nd Generation Nutrient Separating Baffle Box and an up-flow filtration system and/or a modular wetland system. The contract was awarded to three vendors: Jobear Contracting, Inc., Don Luchetti Construction, Inc., and Gregori Construction, Inc. The project has an engineer estimate of $243,000.
• The project is located in the City of Palm Bay, Florida.
• The project aims to reduce pollutant loading and silt entering the Indian River Lagoon.
• The project includes the installation of a 2nd Generation Nutrient Separating Baffle Box and an up-flow filtration system and/or a modular wetland system.
• The contract was awarded to three vendors.
• The project has an engineer estimate of $243,000.