The contract is for the reconstruction of Christophers Crossing from Whittier Drive to Walter Martz/Poole Jones Road. The project includes widening the existing two-lane open section median divided roadway to a four-lane closed section median divided roadway, upgrading the existing drainage system, and adding a shared-use path along Christophers Crossing. The contract also includes the construction of stormwater management facilities. The bid tabulation lists the total bid price for each vendor, with the lowest bid being $7,919,850.78 from Rustler Construction, Inc. and the highest bid being $10,188,695.00 from Ross Contracting, Inc. Key aspects of the contract include:
• Roadway widening and pedestrian enhancements
• Upgrading the existing drainage system
• Adding a shared-use path along Christophers Crossing
• Constructing stormwater management facilities
• The project is located in Frederick County, Maryland
• The bid tabulation lists the total bid price for each vendor