The contract is for the 2021 Capital Improvement - 32nd St. SE Highway 9 Crossing Water Main Project, which involves installing approximately 214 lineal feet of 10” DR 9 high density polyethylene (HDPE) water main. The project also includes TESC and surface restoration. The primary purpose of the proposed project is to increase capacity of the water system infrastructure and replace two portions of the existing water main crossing that are comprised of Asbestos Cement.
• The project location is on and in the vicinity of 32nd St. SE and Highway 9, near the City of Lake Stevens, in Snohomish County, Washington.
• The engineer's estimate for the project is $190,000.00.
• The bid submission date was August 3, 2021, 5:00:00 PM EDT.
• The bid opening was held on August 3, 2021, at 2:00 p.m.
• The bidders are D & G Backhoe, Inc., New X, Inc., and Greenshields Industrial Supply, Inc.