The contract is for the inspection of the Salinas pipeline, specifically the segment running from the Salinas Dam to the Salinas Booster Station. The inspection will involve the use of Pure Technologies' SmartBall platform to detect leaks and air pockets, as well as to map the pipeline. The contract includes two phases: the first phase will involve the detection of leaks and air pockets, and the second phase will involve the mapping of the pipeline. The contractor will provide a comprehensive condition assessment report, including details of acoustic events, leak locations, and pipeline alignment. The report will also include a geodatabase with the SmartBall Mapping generated XY alignment, GPS control points, and range of accuracy.
• The inspection will cover approximately 49,000 linear feet of 24-inch reinforced concrete pipe.
• The contractor will use the SmartBall platform to detect leaks and air pockets, and to map the pipeline.
• The contract includes two phases: leak detection and pipeline mapping.
• The contractor will provide a comprehensive condition assessment report, including details of acoustic events, leak locations, and pipeline alignment.
• The report will also include a geodatabase with the SmartBall Mapping generated XY alignment, GPS control points, and range of accuracy.