The contract is for the construction of a new dock, with associated decks and floating components, at the Burton 4-H Center in Tybee Island, Georgia. The project consists of approximately 179 linear feet of construction and will be delivered using the design-bid-build method. The contract was awarded through a competitive bidding process, with a mandatory site visit and pre-qualification certification required for prospective bidders. The contract documents include a bid book, drawings, and specifications, and the contractor will be required to provide performance and payment bonds. The project is expected to be completed within a certain timeframe, but the exact duration is not specified. Key aspects of the project include the construction of a new dock, demolition of a portion of the existing dock, and the installation of associated decks and floating components. The project requires a high level of expertise in construction and engineering, and the contractor will be required to comply with all applicable laws and regulations.
• The contract is for a construction project at the Burton 4-H Center in Tybee Island, Georgia.
• The project consists of approximately 179 linear feet of construction.
• The contract was awarded through a competitive bidding process.
• A mandatory site visit and pre-qualification certification were required for prospective bidders.
• The contract documents include a bid book, drawings, and specifications.
• The contractor will be required to provide performance and payment bonds.
• The project requires a high level of expertise in construction and engineering.