The Washington Road Safe Route To Schools (SRTS) project involves the construction of approximately 2,000 linear feet of sidewalk that is compliant with the Americans with Disabilities Act (ADA). The project includes the installation of 10 ADA ramps, 600 linear feet of crosswalk markings, 2 driveway entrances, and a pedestrian signal. The contract was awarded to Priority Construction, Corp. for $460,505.40. The project is located in Westminster, Maryland, and the contractor is required to comply with all applicable laws and regulations.
• The project requires the construction of a sidewalk that is compliant with the ADA.
• The contractor must install 10 ADA ramps and 600 linear feet of crosswalk markings.
• The project includes the installation of 2 driveway entrances and a pedestrian signal.
• The contractor is required to comply with all applicable laws and regulations.
• The project is located in Westminster, Maryland.
• The contract was awarded for a total amount of $460,505.40.