The contract is for the construction of a 500,000-gallon welded steel reservoir, including installation, piping, and other related work. The project is located near the city of Stanwood, WA, and the engineer's estimate is $2,450,000.00. The contract was awarded to T Bailey, Inc. for $2,306,786.00 plus tax. The key aspects of the contract include the installation of the reservoir, reconfiguration of existing piping and valving, and other related work.
• The project includes the installation of a 500,000-gallon welded steel reservoir
• The reservoir will be equipped with a roof vent, roof hatch, hand railings, and a gutter system
• The project also includes reconfiguring existing piping and valving, new flow meters with vaults, and other related work
• The primary purpose of the proposed project is to increase the storage capacity of the Kayak and the Warm Beach Water Systems
• Construction shall be performed while maintaining service from the existing Snohomish PUD Tank No.1