The contract is for the expansion and buildout of the MRI suite at Ben Taub Hospital for Harris Health System. The project includes the provision of all labor, materials, equipment, and incidentals for the expansion of the first floor and MRI suite. The contract was awarded to The Trevino Group, Inc. on the basis of the lowest priced proposal meeting the requirements and needs of Harris Health System. The contract price is $1,756,000, with an owner contingency of $351,200, for a total of $2,107,200.
• The contract is for a construction project
• The project includes the expansion of the first floor and MRI suite
• The contract was awarded on the basis of the lowest priced proposal
• The contract price is $1,756,000, with an owner contingency of $351,200